Skip to main content

FTA demands no more delay in new Thames Crossing

Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
December 13, 2013 Read time: 3 mins
Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the 6983 Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”.

The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing will be situated and says a final decision will not be made until May 2014.  

FTA contributed to the 1837 Department for Transport consultation on behalf of its members, stating that a new Thames Crossing would be an integral part of the solution to improve capacity for traffic at Dartford. The Association added that there was an urgent and vital need to ease congestion at what is one of the most important national artery routes.

“Congestion needs tackling now,” declared FTA, stating that the cost of queuing should be taken into account, which for a 44 tonne truck averages £1 per minute, outweighing the cost of the Toll and ultimately the price of constructing the right crossing to relieve what are now real pinch-points at Dartford and the Blackwall Tunnel.

Malcolm Bingham, FTA’s head of Road Network Management Policy said: “FTA believes that today’s announcement brings us no closer to building the much needed new Lower Thames Crossing.  There is absolutely no doubt that improving capacity and easing congestion at Dartford is essential.

“After consulting with our members on what the best crossing would be, it was widely considered that Option C would bring the most benefits to the freight industry, and would help tackle congestion at Dartford, and therefore we feel that today’s announcement is simply slowing down the process”.

FTA pointed out that the introduction of free-flow tolling in 2014 will go some way to relieving the queues at the tunnels, but added that even with that, there would still be the requirement for new capacity and there was a definite need to plan more efficiently for the future in order to cope with traffic on these essential routes.

Related Content

  • March 23, 2015
    ‘Expressways’ a move in the right direction to improve UK roads
    “A move in the right direction” is the message from the Freight Transport Association today – responding to the news that a new class of what it calls continental-style ‘expressways’ are to be developed as part of the Highways Agency (HA) Road Investment Strategy. FTA has said it is in support of the development of ‘expressways’ on major A roads across the country and considers them to be a step forward to improve the reliability and safety on some of the major routes across the UK.
  • December 6, 2013
    Pilot for 50 mph limit for HGVs on A9
    Scottish transport minister Keith Brown has announced plans for a 50 mph heavy goods vehicle (HGV) pilot to be introduced at the same time as average speed cameras on Scotland’s A9 road. The trial, which aims to improve the safety and operational performance the route, will go ahead next year alongside a safe driving campaign run by the haulage industry and the A9 Safety Group. In advance of the pilot, the Road Haulage Association will step up their efforts to ensure lorry drivers adhere to safe drivi
  • October 28, 2016
    New system expedites border crossings
    Enforcing border controls can create long queues for travellers, David Crawford looks at potential solutions. Long delays at border crossings in both North America and Europe have sparked the development of new queue visualisation and management technologies that are cutting hours, even days, off international passenger and freight journeys. At the westernmost end of the 2,019km (1,250 mile) Mexico–US frontier, two parallel crossings between Tijuana, in the former country, and the border city of San Diego,
  • April 30, 2015
    The UK’s busiest crossing adopts free flow charging
    Colin Sowman looks at the transition to free-flow charging on the Dartford Crossing, a notorious congestion blackspot on the UK motorway network. The Dartford Crossing, where London’s orbital M25 motorway crosses the lower reaches of the River Thames 32km (20 miles) to the east of Central London, has long been a major source of congestion. Now, to alleviate the congestion caused by some 50 million crossings per year, the Highways Agency has adopted a free-flow charging system - but the Crossing’s location a