Skip to main content

FTA demands no more delay in new Thames Crossing

Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
December 13, 2013 Read time: 3 mins
Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the 6983 Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”.

The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing will be situated and says a final decision will not be made until May 2014.  

FTA contributed to the 1837 Department for Transport consultation on behalf of its members, stating that a new Thames Crossing would be an integral part of the solution to improve capacity for traffic at Dartford. The Association added that there was an urgent and vital need to ease congestion at what is one of the most important national artery routes.

“Congestion needs tackling now,” declared FTA, stating that the cost of queuing should be taken into account, which for a 44 tonne truck averages £1 per minute, outweighing the cost of the Toll and ultimately the price of constructing the right crossing to relieve what are now real pinch-points at Dartford and the Blackwall Tunnel.

Malcolm Bingham, FTA’s head of Road Network Management Policy said: “FTA believes that today’s announcement brings us no closer to building the much needed new Lower Thames Crossing.  There is absolutely no doubt that improving capacity and easing congestion at Dartford is essential.

“After consulting with our members on what the best crossing would be, it was widely considered that Option C would bring the most benefits to the freight industry, and would help tackle congestion at Dartford, and therefore we feel that today’s announcement is simply slowing down the process”.

FTA pointed out that the introduction of free-flow tolling in 2014 will go some way to relieving the queues at the tunnels, but added that even with that, there would still be the requirement for new capacity and there was a definite need to plan more efficiently for the future in order to cope with traffic on these essential routes.

For more information on companies in this article

Related Content

  • Sandra Phillips of Movmi: ‘We’re all trying to get people moving without a car’
    April 30, 2021
    Movmi founder Sandra Phillips talks to Adam Hill about why transport integration is sometimes a matter of trust – and how to empower women in transportation
  • ARTBA proposes path to breaking gridlock on transportation funding
    March 13, 2015
    The American Road & Transportation Builders Association (ARTBA) has outlined a detailed proposal it believes could end the political impasse over how to fund future federal investments in state highway, bridge and transit capital projects. The ‘Getting beyond gridlock’ plan would marry a 15 cents-per-gallon increase in the federal gas and diesel motor fuels tax with a 100 per cent offsetting federal tax rebate for middle and lower income Americans for six years. The plan, ARTBA says, would fund a US$401 bil
  • Electronic toll collection delivers efficient traffic regulation
    February 3, 2012
    Electronic tolling systems have been in use for decades now. Worldwide, steadily more and more tolling systems are being set into operation, providing efficient means for traffic regulation and financing of infrastructure. But despite this maturity enforcement is still not being given the consideration it deserves. Q-Free's Steinar Furan writes
  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str