Skip to main content

FTA demands no more delay in new Thames Crossing

Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
December 13, 2013 Read time: 3 mins
Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the 6983 Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”.

The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing will be situated and says a final decision will not be made until May 2014.  

FTA contributed to the 1837 Department for Transport consultation on behalf of its members, stating that a new Thames Crossing would be an integral part of the solution to improve capacity for traffic at Dartford. The Association added that there was an urgent and vital need to ease congestion at what is one of the most important national artery routes.

“Congestion needs tackling now,” declared FTA, stating that the cost of queuing should be taken into account, which for a 44 tonne truck averages £1 per minute, outweighing the cost of the Toll and ultimately the price of constructing the right crossing to relieve what are now real pinch-points at Dartford and the Blackwall Tunnel.

Malcolm Bingham, FTA’s head of Road Network Management Policy said: “FTA believes that today’s announcement brings us no closer to building the much needed new Lower Thames Crossing.  There is absolutely no doubt that improving capacity and easing congestion at Dartford is essential.

“After consulting with our members on what the best crossing would be, it was widely considered that Option C would bring the most benefits to the freight industry, and would help tackle congestion at Dartford, and therefore we feel that today’s announcement is simply slowing down the process”.

FTA pointed out that the introduction of free-flow tolling in 2014 will go some way to relieving the queues at the tunnels, but added that even with that, there would still be the requirement for new capacity and there was a definite need to plan more efficiently for the future in order to cope with traffic on these essential routes.

For more information on companies in this article

Related Content

  • IBTTA 2011 Annual Meeting highlights developing trends in tolling
    January 26, 2012
    Alain Estiot, chief meeting organiser of this year's IBTTA Annual Meeting and Exhibition, talks about hot topics for discussion. The IBTTA's 79th Annual Meeting and Exhibition, which takes place this year in Berlin in September, will once again take many of the developing trends from around the world and look at their effects on the tolling sector. Host organisation Toll Collect's Alain Estiot, chief meeting organiser, says that the event has to be viewed against a backdrop of major global change.
  • AMG transmission system used in Blackwall Tunnel refurbishment
    May 18, 2012
    AMG Systems has announced it has been selected to supply the transmission solution for the refurbished Victorian-built Blackwall Tunnel under the river Thames in London. The three-year refurbishment programme, costing over US$113 million, is being undertaken by Transport for London (TfL) to bring the tunnel up to European safety regulations. P. Ducker Systems (PDS) is undertaking the task of supplying the tunnel systems for the project.
  • Autonomous driving – what can we really expect?
    June 6, 2016
    Dave Marples of Technolution BV looks beyond the hype to the practical implementation of autonomous vehicles. Having looked at the development of this sector for some time, I am concerned about the current state of autonomous driving development as engineering (and marketing) have run way ahead of the wider systemic, and legislative, requirements to support an autonomous future.
  • IBTTA’s Jones sees turbulent times and a bright future for tolling
    November 10, 2017
    Colin Sowman talks to IBTTA’s Pat Jones about the future of tolling in a fast-changing world. Pat Jones may have been executive director and CEO of the International Bridge, Tunnel and Turnpike Association (IBTTA) for 15 years but in his words: “Never before have I seen so much change coming so fast in the transportation and tolling industry.” Amidst all this change, tolling companies are asked to provide funding for roadway building or improvements which will be repaid for over, say, a 30-year concess