Skip to main content

FTA demands no more delay in new Thames Crossing

Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
December 13, 2013 Read time: 3 mins
Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the 6983 Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”.

The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing will be situated and says a final decision will not be made until May 2014.  

FTA contributed to the 1837 Department for Transport consultation on behalf of its members, stating that a new Thames Crossing would be an integral part of the solution to improve capacity for traffic at Dartford. The Association added that there was an urgent and vital need to ease congestion at what is one of the most important national artery routes.

“Congestion needs tackling now,” declared FTA, stating that the cost of queuing should be taken into account, which for a 44 tonne truck averages £1 per minute, outweighing the cost of the Toll and ultimately the price of constructing the right crossing to relieve what are now real pinch-points at Dartford and the Blackwall Tunnel.

Malcolm Bingham, FTA’s head of Road Network Management Policy said: “FTA believes that today’s announcement brings us no closer to building the much needed new Lower Thames Crossing.  There is absolutely no doubt that improving capacity and easing congestion at Dartford is essential.

“After consulting with our members on what the best crossing would be, it was widely considered that Option C would bring the most benefits to the freight industry, and would help tackle congestion at Dartford, and therefore we feel that today’s announcement is simply slowing down the process”.

FTA pointed out that the introduction of free-flow tolling in 2014 will go some way to relieving the queues at the tunnels, but added that even with that, there would still be the requirement for new capacity and there was a definite need to plan more efficiently for the future in order to cope with traffic on these essential routes.

For more information on companies in this article

Related Content

  • FTA launches cycle-friendly HGV sat-nav
    May 28, 2013
    As part of its continuing efforts to raises safety standards in the logistics industry, the UK’s Freight Transport Association (FTA) launched what it says is the world’s first satellite navigation system incorporating an HGV Cyclist Alert system. Currently only available in London, the Pro Nav 420’s HGV Cyclist Alert warns the truck driver when approaching a section of road that has been designated by Transport for London (TfL) as a “HGV/Cyclist convergence area”, such as junctions where large numbers of HG
  • FTA says Highways Agency new name reflects importance of role
    December 10, 2014
    A government announcement has revealed that the UK’s Highways Agency will be replaced with Highways England and will be a government-owned company from April 2015. In support of the changes, the Freight Transport Association (FTA) has said that “the new name reflects the importance of its new role.” In its first strategic business plan, Highways England sets out how the new body will deliver the Government’s US$23.5 billion road investment programme over the next five years. The plan envisages spend
  • New system to prevent Hazchem and over-height vehicles entering tunnel
    August 20, 2015
    An impending move to free-flow charging prompted a search for automated dangerous goods identification and over-height detection systems at the Thames Crossing to the east of London. Manned toll booths are increasingly being consigned to history by the onslaught of all-electronic charging. However, a secondary function of the traditional manned plazas has been to prevent non-compliant vehicles using the facility or to tell a driver that that they need to use a specific lane or wait for an escort. Automating
  • FTA concerned over ORR track charges proposal
    November 1, 2013
    Responding to the announcement by the Office of Rail Regulation (ORR) regarding its decision of the change to track access charges for 2014-2019, the FTA has said that “there is still the need for better understanding of the rail freight market and the expectations of existing and potential new customers”, and believes that the ORR's final determination which will increase freight rates by 21 per cent over the control period, four per cent per year will be a major set-back for promoting future growth for th