Skip to main content

FTA demands no more delay in new Thames Crossing

Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
December 13, 2013 Read time: 3 mins
Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the 6983 Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”.

The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing will be situated and says a final decision will not be made until May 2014.  

FTA contributed to the 1837 Department for Transport consultation on behalf of its members, stating that a new Thames Crossing would be an integral part of the solution to improve capacity for traffic at Dartford. The Association added that there was an urgent and vital need to ease congestion at what is one of the most important national artery routes.

“Congestion needs tackling now,” declared FTA, stating that the cost of queuing should be taken into account, which for a 44 tonne truck averages £1 per minute, outweighing the cost of the Toll and ultimately the price of constructing the right crossing to relieve what are now real pinch-points at Dartford and the Blackwall Tunnel.

Malcolm Bingham, FTA’s head of Road Network Management Policy said: “FTA believes that today’s announcement brings us no closer to building the much needed new Lower Thames Crossing.  There is absolutely no doubt that improving capacity and easing congestion at Dartford is essential.

“After consulting with our members on what the best crossing would be, it was widely considered that Option C would bring the most benefits to the freight industry, and would help tackle congestion at Dartford, and therefore we feel that today’s announcement is simply slowing down the process”.

FTA pointed out that the introduction of free-flow tolling in 2014 will go some way to relieving the queues at the tunnels, but added that even with that, there would still be the requirement for new capacity and there was a definite need to plan more efficiently for the future in order to cope with traffic on these essential routes.

Related Content

  • November 16, 2015
    FTA says new strategy for motoring agencies must improve service
    The Freight Transport Association (FTA) says the Government’s consultation on a new strategy for its three motoring agencies is a positive step that recognises the challenges faced by commercial freight and fleet operators. The Department for Transport (DfT) is consulting on the strategic direction to be taken over the course of the current Parliament by the Driver and Vehicle Licensing Agency (DVLA), the Driver and Vehicle Standards Agency (DVSA) and the Vehicle Certification Agency (VCA). Karen De
  • June 22, 2017
    FTA says new London road charging proposals present opportunities and challenges
    The UK’s Freight Transport Association (FTA) says new proposals announced by the Mayor of London for road charging based on elements such as distance travelled and vehicle emissions could be a positive step for freight operators, provided they don’t simply add cost.
  • November 11, 2014
    Prime Minister’s ‘roads revolution’ good news for industry
    Responding to the UK Prime Minister’s announcement which outlined a ‘roads revolution,’ the Freight Transport Association (FTA) has said that plans to deliver roads improvements across the country are good news for the freight and logistics industry. David Cameron stated that plans for the biggest road building programme for almost half a century will be unveiled in next month's Autumn Statement and would contain a US$24 billion overhaul of 100 of Britain's busiest roads and motorways by the end of the
  • June 14, 2016
    Clarity needed on future of Severn bridges, says FTA
    The Freight Transport Association (FTA) has called on members of the Welsh Affairs Committee to press the Government for clearer information about the future of the Severn crossings, which return to public ownership in 2018. FTA appeared before the Welsh Affairs Committee in Chepstow alongside FTA member Owens Group to give evidence about the two bridges, which are currently operated by Severn River Crossing PLC. The bridge tolls are amongst the highest in the country and FTA is seeking clarity about t