Skip to main content

FTA concerns addressed in Government response on all-lane running

The UK Freight Transport Association (FTA) is pleased its concerns about management and signalling on smart motorways have been addressed in the Government’s response to a Transport Select Committee report published this week. FTA raised its concerns with Highways England on Red X compliance and proper management of the signal systems on smart motorways. The Government has responded to the Transport Select Committee’s report on all-lane running, highlighting these concerns. Smart motorways use tech
December 14, 2016 Read time: 2 mins
The UK 6983 Freight Transport Association (FTA) is pleased its concerns about management and signalling on smart motorways have been addressed in the Government’s response to a Transport Select Committee report published this week.
 
FTA raised its concerns with 8101 Highways England on Red X compliance and proper management of the signal systems on smart motorways. The Government has responded to the Transport Select Committee’s report on all-lane running, highlighting these concerns.
 
Smart motorways use technology to actively manage traffic, keeping vehicles flowing freely and increasing the capacity of the road by either temporarily or permanently opening the hard shoulder to traffic.
 
FTA had said that rather than denying road users the much-needed benefits of more reliable journey times that smart motorways provide, the focus should be on educating drivers on how to use them safely, what the various signs mean and what they should do in the event of a breakdown.
 
Malcolm Bingham, FTA’s head of Road Network Management Policy, said: “FTA recognises the importance of looking at the safety aspects of vehicles coming to a halt in a live lane, but this is something that could happen even with a hard shoulder as vehicle faults can occur anywhere and there must be a system to deal with such occurrences, particularly on busy sections of motorway. The Government’s evidence on schemes already built show that there is also growing positive evidence of the safety of all lane running.”
 
UTC

Related Content

  • February 28, 2022
    Putting the brakes on smart motorways
    The UK government has announced that development of its all-lane running highways is going to be put on hold for another few years to assess safety data. Adam Hill finds out why
  • December 20, 2016
    M6 should be priority for Government investment, drivers tell FTA
    The Freight Transport Association (FTA) has been looking at stretches of the UK’s strategic road network that would most benefit from Government investment following the Chancellor’s commitment in his Autumn Statement to fund improvements to congestion hot spots. Philip Hammond said the Government would spend IS$1.6 billion (£1.3 billion) on improving England’s roads, including US$222 million (£220 million) on tackling congestion at pinch points and US$33 million (£27 million) on an expressway connecting Ox
  • September 22, 2014
    FTA disappointed at Dartford free-flow toll delay
    ‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
  • December 13, 2013
    FTA demands no more delay in new Thames Crossing
    Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil