Skip to main content

Four drivers a month deliberately ignore Manchester motorway closures

Highways England is urging drivers Highways England is not to put road workers’ lives at risk by deliberately ignoring road closures on the M60 and M62 near Manchester. New figures have revealed that four drivers a month are entering closed sections of road in the Manchester smart motorway scheme to either overtake traffic on the motorway or avoid using diversion routes. Highways England has released CCTV footage showing a driver ignoring an overnight slip road closure at junction 11 of the M60 at Ecc
December 9, 2016 Read time: 2 mins
8101 Highways England is urging drivers Highways England is not to put road workers’ lives at risk by deliberately ignoring road closures on the M60 and M62 near Manchester.

New figures have revealed that four drivers a month are entering closed sections of road in the Manchester smart motorway scheme to either overtake traffic on the motorway or avoid using diversion routes.

Highways England has released CCTV footage showing a driver ignoring an overnight slip road closure at junction 11 of the M60 at Eccles, where he is seen being chased through the construction area by shocked road workers. The video is available on %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal YouTube Visit YouTube page false http://www.youtube.com/watch?v=IXxLgYawDRk false false%>.

Drivers are being warned that they could be prosecuted if they ignore road closures, and electronic signs at the side of the motorway are also being used to display the message ‘Don’t ignore road closures. CCTV in operation.’

Earlier this year, a drunk driver received a 12-month prison sentence and was disqualified from driving for 15 months after ignoring an overnight slip road closure at junction 23 of the M60 near Ashton-under-Lyne.

Over 400 people are currently working on the project to create a smart motorway between junction 8 of the M60 near Sale and junction 20 of the M62 at Rochdale.
 
The hard shoulder is being converted to an extra lane on a five mile stretch of the M62, and variable speed limits will be introduced on new overhead electronic signs along the entire 17-mile route to tackle congestion and keep traffic moving.
 
A total of 95 drivers deliberately travelled into construction areas on the Manchester smart motorway scheme over the past 22 months to try and cut their journey times. The majority of the incidents happened overnight, between 10pm and 6am, when carriageway and slip road closures are in place as traffic levels are lower.
 
Over a third of the incidents (34) involved drivers ignoring slip road closures, almost a third (29) related to vehicles crossing barriers or cones at the side of the motorway, and over a quarter (26) saw drivers take no notice of lane closures. There were also six incidents where drivers ignored full carriageway closures.
 
The Manchester smart motorway scheme is due to be completed in autumn 2017.
UTC

Related Content

  • August 26, 2016
    Used EV batteries to transform stationary storage
    According to a report (link http://about.bnef.com/landing-pages/new-life-used-ev-batteries-stationary-storage/.) by Bloomberg New Energy Finance (BNEF), the electric vehicle market is set to grow quickly, but so far there has been no consensus on a ‘second-life’ for the many used EV batteries. In this report, senior analyst Claire Curry has compiled the first data and shows that low-cost energy storage could be here sooner than previously thought. She projects that there will be 29 GWh of used EV batter
  • November 6, 2018
    Uber seeks to resume AV trials nearly eight months after Arizona fatality
    Uber wants to resume testing its self-driving cars on public roads nearly eight months after one of its autonomous vehicles (AV) killed a pedestrian in Arizona. The ride-hailing company has released a voluntary safety report to the US National Highway Traffic Safety Administration which includes safety enhancements to help prevent crashes and fatalities. Uber says its AVs would include two mission specialists – employees who have completed advanced training courses in self-driving vehicle operations. The
  • May 21, 2012
    Skyline writes it large
    Skyline Products will soon be installing the largest ITS-grade, full-colour, 20mm-masked LED Dynamic Message Sign (DMS) in the US. The Colorado DOT will use the sign as part of its I-70 speed harmonisation pilot to manage traffic travelling between mountain ski destinations and Colorado.
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.