Skip to main content

First EV fast charging points operational in France

Two electric vehicle (EV) charging points have gone into service as part of the Corri-Door project, which benefits from almost US$6.5 million funding under the EU TEN-T Programme. The aim of the Corri-Door project is to enable an interoperable fast charging network and foster rapid electric vehicle deployment in France and in Europe. The two first fast charging points went service in the Bosgouet Nord rest area on the A13, 128 kilometres from Paris and Tardenois Nord rest area on the A4, 97 kilometres f
June 1, 2015 Read time: 2 mins
Two electric vehicle (EV) charging points have gone into service as part of the Corri-Door project, which benefits from almost US$6.5 million funding under the EU TEN-T Programme.  The aim of the Corri-Door project is to enable an interoperable fast charging network and foster rapid electric vehicle deployment in France and in Europe.

The two first fast charging points went service in the Bosgouet Nord rest area on the A13, 128 kilometres from Paris and Tardenois Nord rest area on the A4, 97 kilometres from Paris. They are part of a pilot deployment of 200 new fast charging points along the main French highways which will be completed by December 2015.

The Corri-Door project will analyse many aspects related to the usage of electric vehicles and develop innovative business models supporting the deployment of a fast charging infrastructure. Corri-Door will also provide a roadmap for the rollout of electric vehicle charging infrastructure in France, as well as recommendations for other EU countries.

Co-funded by the European Commission under the TEN-T Annual Call 2013, priority decarbonisation/reduction of noise, Corri-Door is a project involving seven consortium partners including business and engineering schools. Its implementation is monitored by INEA, the European Commission's Innovation and Networks Executive Agency.

Related Content

  • Transurban announces preferred contractor for NorthConnex
    March 18, 2014
    Melbourne-based toll-road operator Transurban Group has announced that the consortium Lend Lease Bouygues is set to design and build the Sydney, Australia, NorthConnex tunnel link between the M1 and M2 motorways in the city’s northwest. The nine kilometre, 80 km/h tolled link involves two motorway tunnels, built with a three lane capacity for future growth but initially marked for two lanes each way. It provides the missing link in the National Highway Network and offers a safe and more efficient way of
  • Making ITS connections requires leadership
    January 23, 2020
    From making the commute more bearable to saving the planet, Jim Alfred of BlackBerry Certicom believes that ITS has the capacity to drive a range of transformational opportunities – but leadership is required, he warns
  • EU support for transport links in Vienna, Sweden, Finland
    November 15, 2013
    The European Union will use over US$15 million from the Ten-T programme to co-finance two initiatives for the extension of Vienna’s tri-modal port container handling capacity and a project to upgrade the transport link between northern Sweden and western Finland. The project to extend Vienna’s tri-modal port will receive funds of over US$7 million and includes studies and works which will help eliminate major bottlenecks in the port's transfer and combination capacity. The studies will plan and design
  • Transport MEPs call for boost in development of transport infrastructure
    September 30, 2016
    Improvements in maximising the use of EU funding are needed to reduce disparities in infrastructure development between Central and Eastern Europe and the rest of the EU, MEPs say in an own-initiative report voted in the Transport and Tourism committee on Monday. EU member states and the European Commission should focus on completing the TEN-T corridors, bridging missing links, removing bottlenecks and improve connections between different modes of transport. To date, most of the transport infrastructure