Skip to main content

First EV fast charging points operational in France

Two electric vehicle (EV) charging points have gone into service as part of the Corri-Door project, which benefits from almost US$6.5 million funding under the EU TEN-T Programme. The aim of the Corri-Door project is to enable an interoperable fast charging network and foster rapid electric vehicle deployment in France and in Europe. The two first fast charging points went service in the Bosgouet Nord rest area on the A13, 128 kilometres from Paris and Tardenois Nord rest area on the A4, 97 kilometres f
June 1, 2015 Read time: 2 mins
Two electric vehicle (EV) charging points have gone into service as part of the Corri-Door project, which benefits from almost US$6.5 million funding under the EU TEN-T Programme.  The aim of the Corri-Door project is to enable an interoperable fast charging network and foster rapid electric vehicle deployment in France and in Europe.

The two first fast charging points went service in the Bosgouet Nord rest area on the A13, 128 kilometres from Paris and Tardenois Nord rest area on the A4, 97 kilometres from Paris. They are part of a pilot deployment of 200 new fast charging points along the main French highways which will be completed by December 2015.

The Corri-Door project will analyse many aspects related to the usage of electric vehicles and develop innovative business models supporting the deployment of a fast charging infrastructure. Corri-Door will also provide a roadmap for the rollout of electric vehicle charging infrastructure in France, as well as recommendations for other EU countries.

Co-funded by the European Commission under the TEN-T Annual Call 2013, priority decarbonisation/reduction of noise, Corri-Door is a project involving seven consortium partners including business and engineering schools. Its implementation is monitored by INEA, the European Commission's Innovation and Networks Executive Agency.

Related Content

  • PG&E to launch EV pilot in San Joaquin
    July 2, 2018
    Pacific Gas and Electric Company (PG&E) will launch an electric vehicle (EV) pilot to help San Joaquin Regional Transit District prepare for electric transportation. The California-based bus operator intends to have a fully-electric fleet by 2025. PG&E says it will carry out tests to make EVs more available to transit agencies while connecting underserved communities with clean energy transportation options. Under the agreement, PG&E will analyse and compare charging at various times of the day using diff
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • ProPart AV trial crosses the line
    March 25, 2020
    The perceived safety benefits of autonomous vehicles can only be realised with precise positioning. Ben Spencer reports from Sweden on work by a European consortium which aims to use the technology to allow a truck to carry out an automated lane change
  • Asecap debates the future of tolling
    August 23, 2016
    Colin Sowman reports form Asecap’s Study & Information Days event in Madrid. At Asecap’s (the Association of European Toll Road Operators) recent Study and Information Days event there was no doubt about the subject at the top of the agenda: the European Union Directive 23/2014/EU. This will introduce fundamental changes to the concession model under which Asecap members operate more than 50,000km of tolled highways and, in response, it has compiled a report entitled Proposal for a Sustainable Concession Mo