Skip to main content

European fast charger project launched

The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment. The aim of the project is be to create a
December 18, 2014 Read time: 2 mins
The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment.

The aim of the project is be to create an open access fast charging corridor along major motorways connecting Sweden, Denmark, Germany and the Netherlands via a total of 155 chargers.

The first results will be available shortly; the first charging stations are already installed and ready to use in Denmark, operated by Clever, and in the Netherlands by Fastned.  The open access fast charging corridor is expected to be completed by the end of December 2015.

The project is funded by the Trans-European Transport Networks (Ten-T), via which the 1816 European Union contributes to the internal market in order to harmonise and better connect transport systems in Europe.

Leading partner of the Electric project is ABB (Netherlands), manufacturer of fast charge solutions, Dutch e-mobility operator and retailer Fastned, Danish e-mobility operator Clever, Swedish public utility and e-mobility operator Öresundskraft and the German Testing and Certification Institute VDE Prüf-und Zertifizierungsinstitut.

For more information on companies in this article

Related Content

  • Richard Butter introduces ‘smarter, more innovative’ Intertraffic
    April 5, 2016
    Intertraffic Amsterdam 2016 is bigger, smarter, more innovative, more connected, and more relevant than ever before, as Richard Butter, domain manager for Intertraffic Worldwide Events, explains.
  • San Diego: Let there be (street)light
    March 30, 2020
    The influence of intelligent streetlights is spreading. David Crawford finds that San Diego’s deployment – and attendant legislation – may offer a blueprint for other cities going forward
  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in
  • Battery bottleneck: EV roll-out at risk
    June 17, 2019
    In order for the take-up of electric vehicles – a key part of the future mobility mix - to grow, we need batteries. And that might prove tricky, reports Graham Anderson Industry and commodities experts fear that the growth in electric vehicles (EVs) could be much slower than predicted due to bottlenecks in global battery market supply chains. “People seem to think that the switch from the internal combustion engine to electric vehicles just means you plug your car in rather than fill it with petrol,” a