Skip to main content

European fast charger project launched

The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment. The aim of the project is be to create a
December 18, 2014 Read time: 2 mins
The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment.

The aim of the project is be to create an open access fast charging corridor along major motorways connecting Sweden, Denmark, Germany and the Netherlands via a total of 155 chargers.

The first results will be available shortly; the first charging stations are already installed and ready to use in Denmark, operated by Clever, and in the Netherlands by Fastned.  The open access fast charging corridor is expected to be completed by the end of December 2015.

The project is funded by the Trans-European Transport Networks (Ten-T), via which the 1816 European Union contributes to the internal market in order to harmonise and better connect transport systems in Europe.

Leading partner of the Electric project is ABB (Netherlands), manufacturer of fast charge solutions, Dutch e-mobility operator and retailer Fastned, Danish e-mobility operator Clever, Swedish public utility and e-mobility operator Öresundskraft and the German Testing and Certification Institute VDE Prüf-und Zertifizierungsinstitut.

For more information on companies in this article

Related Content

  • MaaS Market conference platform for pioneering projects
    August 21, 2017
    In opening the session on putting MaaS ideas into practice, Hans Arby, chief executive of UbiGo, told the conference that, “MaaS can mean different things to different people. This is why we decided to run MaaS under real conditions and launch the Gothenburg pilot scheme in 2013.” The trial involved 70 households paying €130/month for 6 months with participants agreeing that 20 cars could be put into storage. More than 12,000 bookings/transactions took place during the trial and there were no drop-outs. Ac
  • Electric minicabs to debut in London
    October 25, 2012
    Chinese electric car manufacturer BYD and London green minicab company greentomatocars have signed a Memorandum of Understanding to create London’s first fleet of all-electric minicabs. BYD will supply greentomatocars with 50 of its pure electric e6 models for trial use in the capital. The cars are expected to be available for customers to use from the second quarter of 2013.
  • Conscience versus convenience
    June 8, 2015
    David Crawford looks at new ways forward for public transport. By 2025, nearly 60% of the world’s population will be living in towns and cities, increasing their extent and density, and the journeys that people make within and between them. In response, the International Association of Public Transport (UITP) wants to see public transport’s global modal share doubling (PTx2) by the same date. “Success in 2025,” a spokesperson told ITS International, “will save 170 million tonnes of oil equivalent and 550
  • New charging network brings electric motoring to UK drivers
    February 26, 2016
    The completion of a new charging network that stretches the length of Britain’s busiest roads makes long-distance, cross-border journeys by electric vehicles (EV) a realistic prospect for millions more drivers in the UK and Ireland. The network stretches from Stranraer in Scotland to Suffolk in the East of England, from Hull in the North East to Holyhead in north-west Wales, connecting with Belfast in Northern Ireland and Dublin in the Republic of Ireland. Each installation includes at least two of t