Skip to main content

European fast charger project launched

The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment. The aim of the project is be to create a
December 18, 2014 Read time: 2 mins
The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment.

The aim of the project is be to create an open access fast charging corridor along major motorways connecting Sweden, Denmark, Germany and the Netherlands via a total of 155 chargers.

The first results will be available shortly; the first charging stations are already installed and ready to use in Denmark, operated by Clever, and in the Netherlands by Fastned.  The open access fast charging corridor is expected to be completed by the end of December 2015.

The project is funded by the Trans-European Transport Networks (Ten-T), via which the 1816 European Union contributes to the internal market in order to harmonise and better connect transport systems in Europe.

Leading partner of the Electric project is ABB (Netherlands), manufacturer of fast charge solutions, Dutch e-mobility operator and retailer Fastned, Danish e-mobility operator Clever, Swedish public utility and e-mobility operator Öresundskraft and the German Testing and Certification Institute VDE Prüf-und Zertifizierungsinstitut.

For more information on companies in this article

Related Content

  • C-ITS in the EU: ‘It has got a little tribal recently’
    April 16, 2019
    As the C-ITS Delegated Act begins its journey through the European policy maze, Adam Hill looks at who is expecting what from this proposed framework for connected vehicles – and why some people are insisting that the lawmakers are already getting things wrong
  • EU to invest in studies on Timisoara airport development
    November 12, 2014
    The EU's TEN-T Programme is to co-fund studies for the construction of an intermodal terminal at Timisoara International Airport in Romania with the aim of promoting the integration of freight transport within the air, rail and road TEN-T network. The project includes a feasibility study and technical, economic and environmental studies that will form the basis for the terminal's design and construction. Once completed, it is expected to contribute to the intermodal growth of freight transport, thus pro
  • European tunnel safety steps up a gear
    September 19, 2017
    David Crawford reviews the latest safety systems installed in European tunnels. Blueprints for the safer road tunnels of the future are emerging fast as European operators invest in technologies to enhance travellers’ prospects of surviving an accident. Central to modern emergency planning is the principle that, following an incident, drivers should be enabled to rescue themselves and their passengers with the aid of prompt and correct identification and communication of the hazard. Roles for cooperativ
  • Cooperative infrastructure an aid to environmental aims
    February 3, 2012
    Speculate to accumulate Andras Kovacs looks at how the historical focus of cooperative infrastructure on safety can be oriented to aid emerging environmental aims