Skip to main content

European fast charger project launched

The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment. The aim of the project is be to create a
December 18, 2014 Read time: 2 mins
The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment.

The aim of the project is be to create an open access fast charging corridor along major motorways connecting Sweden, Denmark, Germany and the Netherlands via a total of 155 chargers.

The first results will be available shortly; the first charging stations are already installed and ready to use in Denmark, operated by Clever, and in the Netherlands by Fastned.  The open access fast charging corridor is expected to be completed by the end of December 2015.

The project is funded by the Trans-European Transport Networks (Ten-T), via which the 1816 European Union contributes to the internal market in order to harmonise and better connect transport systems in Europe.

Leading partner of the Electric project is ABB (Netherlands), manufacturer of fast charge solutions, Dutch e-mobility operator and retailer Fastned, Danish e-mobility operator Clever, Swedish public utility and e-mobility operator Öresundskraft and the German Testing and Certification Institute VDE Prüf-und Zertifizierungsinstitut.

For more information on companies in this article

Related Content

  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b
  • European InterCor project to hold first open C-ITS Testfest
    June 30, 2017
    The EU-funded InterCor project, which involves France, Netherlands, UK and Belgium, is upgrading existing and new Cooperative Intelligent Transport Systems (C-ITS) services and testing them along specific ‘corridors’ to ensure interoperability across borders.
  • Hyperloop: from sci-fi to transport policy
    April 16, 2020
    The future is here. While it has long looked like something from a sci-fi movie, Graham Anderson investigates a technology whose time might have come.
  • European CO-GISTICS project launches reference architecture
    October 22, 2014
    Approaching the end of its first year of activities, the European CO-GISTICS (Co-Logistics) project has revealed the reference architecture that will be used for all pilot sites and services. The architecture details the standards and policies to be used to ensure interoperability and the ability to replicate the services at a wider European level. CO-GISTICS is the first European project fully dedicated to the deployment of cooperative intelligent transport systems (C-ITS) applied to logistics. CO-GI