Skip to main content

European fast charger project launched

The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment. The aim of the project is be to create a
December 18, 2014 Read time: 2 mins
The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment.

The aim of the project is be to create an open access fast charging corridor along major motorways connecting Sweden, Denmark, Germany and the Netherlands via a total of 155 chargers.

The first results will be available shortly; the first charging stations are already installed and ready to use in Denmark, operated by Clever, and in the Netherlands by Fastned.  The open access fast charging corridor is expected to be completed by the end of December 2015.

The project is funded by the Trans-European Transport Networks (Ten-T), via which the 1816 European Union contributes to the internal market in order to harmonise and better connect transport systems in Europe.

Leading partner of the Electric project is ABB (Netherlands), manufacturer of fast charge solutions, Dutch e-mobility operator and retailer Fastned, Danish e-mobility operator Clever, Swedish public utility and e-mobility operator Öresundskraft and the German Testing and Certification Institute VDE Prüf-und Zertifizierungsinstitut.

For more information on companies in this article

Related Content

  • Tolling system interoperability gains momentum
    August 14, 2012
    Efforts to advance national interoperability for tolling systems are gaining momentum, with one protocol promoted by a key operator group emerging as a candidate to form the basis for full AVI interoperability, Tim McGuckin writes. Fuelled by a growing awareness and acceptance of standards-based solutions, the US toll community is quickening towards the goal of interoperability between toll systems across the US. Over 20 years since the advent of electronic toll collection (ETC), key elements are falling in
  • Siemens launches interoperable electric bus charger
    November 4, 2016
    Siemens has launched an interoperable charging infrastructure for e-buses capable of charging buses from different manufacturers. German public transport operator Hamburger Hochbahn is to begin operation of three additional e-buses on its ‘innovation line’ 109.
  • Calculating the cost of stellar solutions
    August 10, 2016
    The increasing availability and accuracy of global navigation satellite system (GNSS) is opening up low-cost options in many areas as David Crawford finds out. Boosting commercialisation of European global navigation satellite system (EGNSS) technologies for ITS initially depends heavily on demonstrating competitive and cost/benefit advantages obtainable from the deployment of EGNOS (the current European Geostationary Navigation Overlay Service), and ultimately the EU’s Galileo constellation (see box). So,
  • EU-wide Railway at low level status of deployment
    October 6, 2017
    Deployment of the European Rail Traffic Management System (ERTMS), an EU-wide railway signalling system is proceeding at a very low-level, according to a new report from European Court of Auditors. In assessing if the ERTMS had been proper planned, deployed and managed, the auditors visited Denmark, Germany, Spain, Italy, Poland and the Netherlands and detected a reluctance from infrastructure managers to invest in the necessary equipment due the expense and a lack individual business cases.