Skip to main content

EU support for rail improvements in the UK to bring faster travel times

The European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme. The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area. The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single
December 12, 2012 Read time: 2 mins
The 1816 European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme.  The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area.

The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single track railway line between Castlefield Junction in Manchester and Newton-le-Willows and Lowton Junctions (roughly halfway to Liverpool).  Works include establishing suitable electrical and gauge clearances along the concerned route, and the installation of 25kV overhead line equipment.

Once finalised, the electrification project will bring considerable benefits for:

• Passengers: Additional trains due to better route management plus an electrified direct route to Manchester Airport

• Rail freight transport: Enhanced capacity between Manchester and TEN-T Priority Project 14 (West Coast Main Line)

• Freight forwarders: Lower costs thanks to reduced costs of leasing, operating and maintaining electric trains

• The environment: reduced emissions as diesel trains are phased out in favour of electric ones

The project will be managed by the 6025 Trans-European Transport Network Executive Agency and is set to be completed by December 2014.

For more information on companies in this article

Related Content

  • A fresh approach to electronic fee collection
    July 16, 2012
    The Utah Transit Authority (UTA) is pioneering fresh approaches to Electronic Fee Collection (EFC) deployment in the US. Its new system, operational since January 2009 on all buses and commuter trains, is the country's first full-network rollout of transit e-ticketing technology built on an open-payment network, according to the organisation's Technology Programme Development Manager Craig Roberts.
  • TfL cycle superhighways plans will still disrupt traffic, says FTA
    January 28, 2015
    The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
  • UK’s latest smart motorway goes live on M6
    April 16, 2014
    The Midlands got a boost today with the launch of the latest stretch of smart motorway, making greater use of technology on the M6 near Birmingham, bringing improved journeys and less congestion. Opening the hard shoulder to traffic during the busiest times between junctions 5 and 8 on the M6 will improve journey times, especially around Birmingham and marks a milestone for the Highways Agency, after several years of investment in this section of the M6. This ten mile stretch means the benefits can now b
  • Safer roads for UK cyclists thanks to government funding
    April 8, 2013
    Cyclists across England are set to benefit from safer roads thanks to a £40 million (US$60.9 million) boost to improve dangerous routes and junctions announced by Transport Minister Norman Baker. The money will be made available to improve the design and layout of roads at 78 locations across the country, with all schemes due for completion within the next 12 months. The schemes are a mix of improvements including the reallocation of road space, significant simplification of road layouts, changes in priorit