EU support for rail improvements in the UK to bring faster travel times

The European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme. The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area. The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single
December 12, 2012 Read time: 2 mins
The 1816 European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme.  The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area.

The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single track railway line between Castlefield Junction in Manchester and Newton-le-Willows and Lowton Junctions (roughly halfway to Liverpool).  Works include establishing suitable electrical and gauge clearances along the concerned route, and the installation of 25kV overhead line equipment.

Once finalised, the electrification project will bring considerable benefits for:

• Passengers: Additional trains due to better route management plus an electrified direct route to Manchester Airport

• Rail freight transport: Enhanced capacity between Manchester and TEN-T Priority Project 14 (West Coast Main Line)

• Freight forwarders: Lower costs thanks to reduced costs of leasing, operating and maintaining electric trains

• The environment: reduced emissions as diesel trains are phased out in favour of electric ones

The project will be managed by the 6025 Trans-European Transport Network Executive Agency and is set to be completed by December 2014.

For more information on companies in this article

Related Content

  • Atkins has designs on Dublin's MetroLink transit network
    February 22, 2023
    Irish capital's new 18.8km link is designed to connect existing services with city destinations
  • ODoT selects AeroVironment for ‘Green Highway’
    April 20, 2012
    AeroVironment has been selected by the Oregon Department of Transportation (ODoT) to install its high-power Level 3 electric vehicle (EV) fast charging stations along the I-5 corridor from the California state line to the Willamette Valley. This is the beginning of the “Green Highway,” a vision for safe and consistent charging infrastructure spanning the West Coast, allowing EV drivers to travel with confidence from San Diego to Vancouver in Canada.
  • ‘Formation flying’ engineering trains used to upgrade railway
    February 16, 2017
    In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on
  • Australia highway to receive smart tech 
    October 12, 2021
    Smart motorway tech will be installed between Pine River and Caloundra Road