Skip to main content

EU support for rail improvements in the UK to bring faster travel times

The European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme. The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area. The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single
December 12, 2012 Read time: 2 mins
The 1816 European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme.  The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area.

The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single track railway line between Castlefield Junction in Manchester and Newton-le-Willows and Lowton Junctions (roughly halfway to Liverpool).  Works include establishing suitable electrical and gauge clearances along the concerned route, and the installation of 25kV overhead line equipment.

Once finalised, the electrification project will bring considerable benefits for:

• Passengers: Additional trains due to better route management plus an electrified direct route to Manchester Airport

• Rail freight transport: Enhanced capacity between Manchester and TEN-T Priority Project 14 (West Coast Main Line)

• Freight forwarders: Lower costs thanks to reduced costs of leasing, operating and maintaining electric trains

• The environment: reduced emissions as diesel trains are phased out in favour of electric ones

The project will be managed by the 6025 Trans-European Transport Network Executive Agency and is set to be completed by December 2014.

For more information on companies in this article

Related Content

  • Continental wins follow-on order to upgrade Shanghai metro
    February 4, 2019
    Continental has secured a follow-on order for future metro projects in the Chinese city of Shanghai to help increase usage of rail and reduce gridlocks on roads. The project will expand the metro network from 16 to 22 lines by 2020 and cover an area of 970km. Jianhua Hao, head of marketing & sales at Continental China, says the company’s new air spring systems will allow metro trains to travel more quietly and with lower vibration levels.
  • ADAS ‘fastest growing sector’ in automotive field
    July 7, 2015
    According to the latest research by RnR Market Research, Advanced Driver Assistance Systems (ADAS) has been one of the fastest-growing sectors in automotive field and is expected to register a CAGR of 32 per cent during 2014-2019. Currently, developed countries in Europe and America have had nearly eight per cent of new vehicles equipped with ADAS, in contrast to about two per cent in emerging markets. It is predicted that over 25 per cent of new vehicles will carry ADAS by 2019 globally. The Global a
  • Taking tolling towards new opportunities
    May 18, 2016
    Vinci’s André Broto presented his views on how the tolling industry could play an important role in helping authorities ease urban congestion, to delegates at the IBTTA conference. As director of foresight and strategy at Vinci Autoroutes, France, André Broto has been spending some time considering the future of tolling in his own country and worldwide. He presented his thoughts, which include a very different angle of the causes of, and solutions to, congestion at the IBTTA’s (International Bridge, Tunnel
  • M62 managed motorway scheme signs switched on
    February 12, 2013
    Work to upgrade part of the M62 in West Yorkshire to a managed motorway, the first scheme in the Yorkshire and Humber region, reached a significant milestone when the first overhead electronic signs went live. For the first time, the variable advisory speed limit signs have come into operation between junctions 27 and 28 to allow the UK Highways Agency to calibrate and test the technology required for the new managed motorway, with the signs being switched on and off in response to traffic conditions. Advis