Skip to main content

EU support for rail improvements in the UK to bring faster travel times

The European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme. The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area. The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single
December 12, 2012 Read time: 2 mins
The 1816 European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme.  The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area.

The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single track railway line between Castlefield Junction in Manchester and Newton-le-Willows and Lowton Junctions (roughly halfway to Liverpool).  Works include establishing suitable electrical and gauge clearances along the concerned route, and the installation of 25kV overhead line equipment.

Once finalised, the electrification project will bring considerable benefits for:

• Passengers: Additional trains due to better route management plus an electrified direct route to Manchester Airport

• Rail freight transport: Enhanced capacity between Manchester and TEN-T Priority Project 14 (West Coast Main Line)

• Freight forwarders: Lower costs thanks to reduced costs of leasing, operating and maintaining electric trains

• The environment: reduced emissions as diesel trains are phased out in favour of electric ones

The project will be managed by the 6025 Trans-European Transport Network Executive Agency and is set to be completed by December 2014.

For more information on companies in this article

Related Content

  • Jacobs to provide technical advice for Welsh Government’s A465 improvements
    January 27, 2016
    Jacobs Engineering Group is to provide the Welsh Government with technical advisory services for the upgrade of sections 5 and 6 of the A465 between Dowlais Top and Hirwaun. The A465 is a key transport link in Wales and forms part of the trans-European transport network. It is an important strategic route for the urban area of South Wales, providing routes between key settlements. It connects South and West Wales to the Midlands and beyond, to ports serving Ireland, and to other European destinations.
  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • Personal Rapid Transit, clear benefits for European cities
    July 26, 2012
    David Crawford watches the race to get the world's first PRT system up and running. To paraphrase the old joke about buses bunching, you seem to have to wait several decades for a Personal Rapid Transit (PRT) system, and then half a dozen come along together. Currently, in fact, there are well over that number of schemes for driverless electric passenger-carrying 'pod' networks at various stages of planning, design and implementation around the world. Locations range from a straight-off-the-drawing board ne
  • Thales to implement traffic control system on Spanish rail line
    October 7, 2015
    Spanish railway infrastructure administrator Adif has awarded Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months. The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved