Skip to main content

EU support for rail improvements in the UK to bring faster travel times

The European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme. The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area. The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single
December 12, 2012 Read time: 2 mins
The 1816 European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme.  The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area.

The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single track railway line between Castlefield Junction in Manchester and Newton-le-Willows and Lowton Junctions (roughly halfway to Liverpool).  Works include establishing suitable electrical and gauge clearances along the concerned route, and the installation of 25kV overhead line equipment.

Once finalised, the electrification project will bring considerable benefits for:

• Passengers: Additional trains due to better route management plus an electrified direct route to Manchester Airport

• Rail freight transport: Enhanced capacity between Manchester and TEN-T Priority Project 14 (West Coast Main Line)

• Freight forwarders: Lower costs thanks to reduced costs of leasing, operating and maintaining electric trains

• The environment: reduced emissions as diesel trains are phased out in favour of electric ones

The project will be managed by the 6025 Trans-European Transport Network Executive Agency and is set to be completed by December 2014.

For more information on companies in this article

Related Content

  • Gothenburg’s year of congestion charging
    April 9, 2014
    A year after it went live, Colin Sowman examines the technology used for Gothenburg’s congestion charging system and the effect the scheme has had on commuters. When it comes to long-term planning, the Scandinavians take some beating.The West Swedish Agreement is a case in point. Introduced in 2009, the Agreement runs through to around 2027 and aims to create an attractive, sustainable and growing region, and over that timescale the number of journeys is expected to increase by a third. Therefore the Agreem
  • EU-wide Railway at low level status of deployment
    October 6, 2017
    Deployment of the European Rail Traffic Management System (ERTMS), an EU-wide railway signalling system is proceeding at a very low-level, according to a new report from European Court of Auditors. In assessing if the ERTMS had been proper planned, deployed and managed, the auditors visited Denmark, Germany, Spain, Italy, Poland and the Netherlands and detected a reluctance from infrastructure managers to invest in the necessary equipment due the expense and a lack individual business cases.
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • Closer running and investment to boost capacity of Britain’s railways, says new report
    January 4, 2017
    Closer running to increase the frequency of train services, alongside investment in new railway infrastructure, are recommendations to boost UK rail capacity in the new report by the Institution of Mechanical Engineers and the Transportation Research Laboratory (TRL). The report, Increasing capacity; putting Britain’s railways back on track, makes recommendations to meet growing rail passenger demand, which is forecast to double by the 2040s. The Institution of Mechanical Engineers and TRL are offering s