Skip to main content

EU identifies priorities for trans-European transport network until 2030

The European Commission has published nine studies on the state of play and the development needs of the Ten-T core network corridors. The studies have identified infrastructure development needs which represent approximately US$811 billion of financial investment until 2030. They highlight the importance of optimising the use of infrastructure along the corridors, notably through intelligent transport systems, efficient management and the promotion of future-oriented clean transport solutions. This is the
January 20, 2015 Read time: 2 mins
The European Commission has published nine studies on the state of play and the development needs of the Ten-T core network corridors. The studies have identified infrastructure development needs which represent approximately US$811 billion of financial investment until 2030. They highlight the importance of optimising the use of infrastructure along the corridors, notably through intelligent transport systems, efficient management and the promotion of future-oriented clean transport solutions. This is the first time that tens of thousands kilometres of rail, road, inland waterway connections, ports, airports and other transport terminals have been studied in such a comprehensive way and with a common methodology.

Violeta Bulc, EU Commissioner for Transport said, "We have to step up our efforts to make sure the core network will be fully operational by 2030, to ensure smooth transport flows for passengers and goods throughout the EU. Now is the time to invest in TEN-T projects and to maximise the benefits of the Connecting Europe facility and the Commission's US$365 billion investment plan. After all, the Trans-European Transport Network is crucial for a Union striving for more growth, jobs and competitiveness. As Europe is slowly stepping out of the economic crisis, we need a connected Union, without barriers, in order for our single market to thrive."

A team of external experts undertook a comprehensive study for each Trans-European Transport corridor. They analysed the current infrastructure status, located problems hampering traffic flows for passengers and freight, and identified action to be undertaken from now to 2030. They include preliminary lists of projects which aim at completing cross-border and other missing links, removing bottlenecks, inter-connecting transport modes and enhancing interoperability – notably for railway traffic.

The results of these studies will be taken into account when deciding on the allocation of EU funds for the period 2014-2020, under the Connecting Europe facility. The project pipeline resulting from these corridor studies constitutes a particularly important source for the US$365 billion European Investment Plan, which was published by the Commission in November 2014.

Related Content

  • ITS European Congress 2023: Smart Mobility Summit focuses on green issues
    May 25, 2023
    Representatives from EMEA cities discussed road space, liveability and data sharing
  • Cut freight deliveries – improve Southampton’s air quality
    November 23, 2018
    Taking the pressure off cities’ road networks can have a beneficial effect on the environment. David Crawford looks at a new economic model which seeks to quantify the societal effect of freight traffic in Southampton, one of the UK’s five most polluted cities Cuts of 60% or more in volumes of freight deliveries are being predicted - along with badly-needed improvements in air quality - from a load consolidation scheme currently being introduced in the UK port city of Southampton. The forecasts are based o
  • European e-call and Russian Era-Glonass interoperability demonstrated
    July 15, 2014
    To demonstrate the interoperability between the European eCall system and the Russian Era-Glonass system, Glonass Union, VTT, Gemalto and Fujitsu Ten recently participated in live simultaneous demonstrations in Europe and Russia. To help mitigate the consequences of serious road accidents, the European Commission (EC) has adopted a proposal for a regulation concerning a type-approval requirement for deployment of the eCall system. In Russia, a technical regulation on wheeled-vehicle safety with Era-Glona
  • EU budget ‘should help speed up research for decarbonisation of transport’
    September 1, 2017
    Following a vote on the 2018 European Union general budget by the Transport and Tourism Committee (TRAN), chair Karima Delli said that, by adopting its 2018 budget, the TRAN Committee has given clear priorities for the future of mobility in the EU. She went on to say that in a period of great uncertainty for the next EU budgets due to Brexit, it is very important that the EU secures and speeds up research and innovation programmes such as SESAR.