Skip to main content

EU identifies priorities for trans-European transport network until 2030

The European Commission has published nine studies on the state of play and the development needs of the Ten-T core network corridors. The studies have identified infrastructure development needs which represent approximately US$811 billion of financial investment until 2030. They highlight the importance of optimising the use of infrastructure along the corridors, notably through intelligent transport systems, efficient management and the promotion of future-oriented clean transport solutions. This is the
January 20, 2015 Read time: 2 mins
The European Commission has published nine studies on the state of play and the development needs of the Ten-T core network corridors. The studies have identified infrastructure development needs which represent approximately US$811 billion of financial investment until 2030. They highlight the importance of optimising the use of infrastructure along the corridors, notably through intelligent transport systems, efficient management and the promotion of future-oriented clean transport solutions. This is the first time that tens of thousands kilometres of rail, road, inland waterway connections, ports, airports and other transport terminals have been studied in such a comprehensive way and with a common methodology.

Violeta Bulc, EU Commissioner for Transport said, "We have to step up our efforts to make sure the core network will be fully operational by 2030, to ensure smooth transport flows for passengers and goods throughout the EU. Now is the time to invest in TEN-T projects and to maximise the benefits of the Connecting Europe facility and the Commission's US$365 billion investment plan. After all, the Trans-European Transport Network is crucial for a Union striving for more growth, jobs and competitiveness. As Europe is slowly stepping out of the economic crisis, we need a connected Union, without barriers, in order for our single market to thrive."

A team of external experts undertook a comprehensive study for each Trans-European Transport corridor. They analysed the current infrastructure status, located problems hampering traffic flows for passengers and freight, and identified action to be undertaken from now to 2030. They include preliminary lists of projects which aim at completing cross-border and other missing links, removing bottlenecks, inter-connecting transport modes and enhancing interoperability – notably for railway traffic.

The results of these studies will be taken into account when deciding on the allocation of EU funds for the period 2014-2020, under the Connecting Europe facility. The project pipeline resulting from these corridor studies constitutes a particularly important source for the US$365 billion European Investment Plan, which was published by the Commission in November 2014.

Related Content

  • FTA disappointed at Dartford free-flow toll delay
    September 22, 2014
    ‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
  • New Haven shows small can be beautiful
    October 22, 2014
    Connecticut’s new administration is using smart policy and ITS solutions to bridge social divides. Andrew Bardin Williams investigates. With only 130,000 residents, New Haven can hardly be called a metropolis. Measuring less than 502km (18 square miles), the city is huddled against the coast, squeezed between two mountains (appropriately called East Rock and West Rock) that, at 111m and 213m (366ft and 700ft) respectively, can hardly be called mountains. The airport is small and has limited service, and th
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • ASECAP examines tolling during downturns
    September 22, 2014
    ASECAP debated the impact of the financial crises on Europe’s tolling companies and considered the future in diverse economies. Colin Sowman picks some of the highlights. This year ASECAP (Association Europeenne des Concessionnaires d’Autoroutes et d’Ouvrages a’ Peage, with members in 21 countries managing 46,000km of roadway) held its annual Study & Information Days in Athens, Greece – one of the country hardest hit by recent economic problems. While the theme of the conference, Ensuring Sustainability in