Skip to main content

Elevated bike lane opens in Copenhagen

Constructed over the harbour, Copenhagen’s Cykelslangen, or Cycle Snake, is the city’s newest elevated cycle path. The orange cycle lane is the latest addition to Copenhagen's innovative approach to cycling infrastructure and connects to the harbour bridge, leaving the ground level free for pedestrians. The 220 metre long Cykelslangen was opened on 29 June, after eight years of planning and construction. Copenhagen is renowned for being a cycling city, as some 36 per cent of daily commutes are undert
July 29, 2014 Read time: 1 min

Constructed over the harbour, Copenhagen’s Cykelslangen, or Cycle Snake, is the city’s newest elevated cycle path. The orange cycle lane is the latest addition to Copenhagen's innovative approach to cycling infrastructure and connects to the harbour bridge, leaving the ground level free for pedestrians.

The 220 metre long Cykelslangen was opened on 29 June, after eight years of planning and construction.

Copenhagen is renowned for being a cycling city, as some 36 per cent of daily commutes are undertaken by bicycle. The city aims to increase cycling's modal share to 50 per cent by 2025, through developing safe and separated infrastructure for cyclists as well as pedestrians and cars.

Related Content

  • Opinion: With e-scooters sharing is caring
    April 25, 2022
    Micromobility use is expanding: Voi’s Matthew Pencharz explains why lawmakers need to catch up with the growth of e-scooters in particular and the implications for safety
  • Cost benefit: just $25 boosts pedestrian safety in Florida
    April 29, 2019
    A relatively straightforward change to the way that pedestrians cross the street in a Florida city has made a significant safety improvement. And what’s more, it was cheap, finds David Crawford Installing a lead pedestrian interval (LPI) system at 25 central business district signalised intersections in the Florida city of Lakeland has cut numbers of incidents involving pedestrians by some 60% - at a cost of US$25 for 30 minutes' work, according to traffic operations manager Angelo Rao.
  • Strike action prompts commuters to try something different
    June 2, 2014
    David Crawford highlights responses to transit disruption on both sides of the Atlantic. Shortly before workers at San Francisco Bay Area Rapid Transit (BART) began a lengthy round of pay and conditions-related strikes in summer 2013, impacting on the daily lives of 400,000 communities, online ridesharing group Avego publicised a new web address: bartstrike.com. By the start of the following week, Avego was encouraging stranded commuters to download its smartphone app by offering them the chance in a raffle
  • San Francisco Bay Bridge east span opens
    September 5, 2013
    After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.