Skip to main content

Electrosonic installs Hindhead tunnel control room display

The twin-bore Hindhead tunnel in southern England has made the A3 London to Portsmouth route safer and more efficient, aided by the large overview video wall and operator consoles installed in the control room by Electrosonic, working with main contractor Balfour Beatty Engineering Services for the Highways Agency. To meet the Highways Agency’s requirement that the control room should operate in a similar way to other traffic control rooms on the major road network, Electrosonic devised a solution based on
December 3, 2012 Read time: 2 mins
The twin-bore Hindhead tunnel in southern England has made the A3 London to Portsmouth route safer and more efficient, aided by the large overview video wall and operator consoles installed in the control room by 6683 Electrosonic, working with main contractor 3902 Balfour Beatty Engineering Services for the 503 Highways Agency.

To meet the Highways Agency’s requirement that the control room should operate in a similar way to other traffic control rooms on the major road network, Electrosonic devised a solution based on ergonomic operator consoles and a video wall display.

The video wall features six projection cubes, where operators can monitor images from 104 cameras and review the tunnel lighting, ventilation, incident detection and other support system data supplied by the SCADA (Supervisory Control and Data Acquisition) system.  The image processor feeding the display is configured to receive 36 video inputs and four computer graphics images, and can display any required combination of images, each of which can be any size and positioned anywhere on the display, selected by the operator at the click of a mouse.

For more information on companies in this article

Related Content

  • London Underground installs EV charge points
    August 28, 2013
    Siemens has completed the supply and installation of charging infrastructure for electric vehicles in twelve London Underground car parks across the capital for UK Power Network Services. The new network of sixty Siemens AC intelligent charge posts is fully integrated into Source London, the UK's largest electric vehicle membership scheme, with over 1,300 charge points. The charge points are supported by associated services including management, operation and maintenance and the supply of charging post m
  • Speedy steps up safety on new fleet vehicles
    June 24, 2013
    Speedy Hire, the UK’s leading provider of equipment rental and support services to construction, infrastructure and industrial related industries has installed CCTV technology on its new fleet of heavy goods vehicles (HGV) and light commercial vans as part of an on-going commitment to road safety. The equipment will improve visibility for drivers, support driver behaviour feedback and training and protect Speedy against erroneous insurance claims. Commercial fleet CCTV company, Vue, supplied its video data
  • Traffic management is increasingly image conscious
    January 27, 2025
    At the Vision show in Stuttgart, Germany, a wide variety of traffic-related solutions were on display. Adam Hill takes the temperature of the industry…
  • UK city council deploys fully hosted civil enforcement platform
    September 24, 2015
    Portsmouth City Council in the UK has awarded Videalert a contract to deploy its hosted civil enforcement platform that does not require any hardware or software to be installed on customer premises. The Department for Transport (DfT) Manufacturer Certified hosted solution will enable the council to rapidly introduce unattended enforcement at a number of bus lane locations in the city to reduce the high incidence of contraventions currently committed by motorists and enable the provision of an even bette