Skip to main content

Econolite introduces cloud-based signal performance solution

Econolite has launched Centracs Signal Performance Measures (SPM), a cloud-based high-resolution traffic data collection and analytics software solution designed to improve traffic signal optimisation and continuous monitoring. It has been developed in support of the fourth round of the Every Day Counts (EDC-4) program of the US Federal Highway Administration (FHWA) that encourages implementation of automated traffic signal performance measures as a means to optimise traffic signal coordination and programm
July 31, 2017 Read time: 1 min
1763 Econolite has launched Centracs Signal Performance Measures (SPM), a cloud-based high-resolution traffic data collection and analytics software solution designed to improve traffic signal optimisation and continuous monitoring. It has been developed in support of the fourth round of the Every Day Counts (EDC-4) program of the US 831 Federal Highway Administration (FHWA) that encourages implementation of automated traffic signal performance measures as a means to optimise traffic signal coordination and programming.


The 324 US Department of Transportation recommends re-timing of traffic signals every three to seven years.  Centracs SPM enables transportation agencies to make signal re-timing strategy decisions based on high-resolution dynamic traffic performance data without the costs associated with manually-collected low-resolution data and simulations

It provides continuous traffic data collection and analytics, enabling transportation professionals to proactively optimise signal timing, enhancing mobility and safety. In addition, Centracs SPM is suitable for deployment in connected and autonomous vehicles and Smart City applications.

For more information on companies in this article

Related Content

  • Enlarged transportation data highlights wider issues
    October 18, 2013
    Todd Litman of the Victoria Transport Policy Institute in Canada makes the case for enlarged and improved transport-related data. Comprehensive, high quality data is useful, or even essential, for many types of decision making and transport is no exception. Planners and researchers can cite countless situations where their understanding of transport problems and their ability to evaluate potential solutions is constrained by inadequate data.
  • Urban utility
    July 24, 2012
    Steve Lane, Commercial Director at Triteq, talks about the successful deployment of ZigBee in Barcelona where a low-cost wireless metropolitan network for location and citizen services was established. The project, he says, demonstrates ZigBee's effectiveness as an urban communications system solution ZigBee is based on the IEEE radio frequency standard 802.15.4 - 2006 for Wireless Personal Area Networks (WPAN), which provides a license-free radio frequency for a flexible, robust private wireless network. Z
  • In-vehicle intersection violation Warning system
    January 31, 2012
    Mike Schagrin, ITS Joint Program Office, RITA, and John Harding, NHTSA, describe US progress towards an in-vehicle Intersection Violation Warning system. In 2008, there were 37,261 fatalities on US roadways. Of these, 7,772, some 20.8 per cent of the total, were defined as intersection crashes or intersection-related crashes. Through a multi-agency research initiative led by the Research and Innovative Technology Administration (RITA), the US Department of Transportation (USDOT) has developed a prototype In
  • TransCore to design and build I-66 active traffic management system
    February 15, 2013
    One of the most congested interstates in Virginia, US, is to get an Active Traffic Management (ATM) system. The Virginia Department of Transportation (VDOT) has selected TransCore, a division of Roper Industries, to design and build its I-66 ATM system on northern Virginia’s main highway into the District of Columbia. The US$34 million contract is 90 percent federally funded and will support thirty-four miles of highway from the District of Columbia to Gainesville US-29 in Prince William County. The projec