Skip to main content

Dubai RTA implementing integrated synchronisation for signalised junctions

The number of signalised junctions in Dubai has increased to 412, most of which are controlled by the Traffic Control System Centres of the Roads & Transport Authority (RTA). According to engineer Maitha bin Udai, CEO of RTA's Traffic and Roads Agency, the agency is currently working on an integrated project to synchronise and upgrade databases for 180 main signalised junctions. Some 60 of them will be completed in the current year, and 120 next year, she said, adding that the implementation of the project
July 23, 2012 Read time: 2 mins
The number of signalised junctions in Dubai has increased to 412, most of which are controlled by the Traffic Control System Centres of the 6700 Dubai's Roads and Transport Authority (RTA).

According to engineer Maitha bin Udai, CEO of the RTA's Traffic and Roads Agency, the agency is currently working on an integrated project to synchronise and upgrade databases for 180 main signalised junctions. Some 60 of them will be completed in the current year, and 120 next year, she said, adding that the implementation of the project was in response to recommendations in a traffic study conducted by the RTA to improve the performance of the traffic signals in the emirate. The experimental studies conducted on some junctions in Dubai showed that the trip time dropped by 15 per cent in areas covered by the study and in which synchronisation and database upgrades were undertaken.

"The Agency attends to training engineers and operators of the intelligent traffic systems on a number of traffic plans for synchronising the timing of traffic lights, where such plans may in some junctions reach six different plans for a single traffic light per day, depending on peak hours and frequency of congestion in roads leading to junctions,” said Engineer Maitha. “The Agency also trains them on the latest techniques of signals timings, and methods of linking a number of traffic lights. The RTA is keen that the lapse time for all directions shall not exceed 240 seconds and that the connected traffic signals should not exceed 16 signals," she continued.

In respect of the traffic control centre, Maitha said the capacity of devices operating the signalling system has been upgraded at the control centre in order to manage the current and future of signalised junctions. "The Centre is equipped with the latest version of data analysis system to analyse information transmitted by sensors. The number of surveillance cameras increased to 240 cameras, and the Agency is moving ahead with plans to improve the calibre of traffic services rendered to the public," said Maitha.

For more information on companies in this article

Related Content

  • Electronic toll collection: Change is in the air
    November 7, 2024
    Trends in technology plus users’ comfort in adopting new advances indicate that the environment for a new electronic toll collection architecture is evolving. Hal Worrall considers what this might look like
  • The case for integrating urban traffic control and parking
    February 3, 2012
    Although urban traffic control and parking management are inextricably linked in so many ways, there remain fundamental differences which undermine closer integration. Car parking guidance systems can have a significant, positive impact on congestion in town and city centres, however conflicting business models still stand in the way of the more profound integration of car parking management and Urban Traffic Control (UTC) systems.
  • Russia looks to ITS to curb congestion and reduce accidents
    May 7, 2015
    Major ITS installations are planned as the Russian capital Moscow grapples with extensive traffic problems. At the end of 2014, Russia’s first complex intelligent transport system (ITS) started easing traffic problems in and around the capital Moscow, following the implementation of the plans by the federal government and the city’s authorities.
  • Nearly 59,000 US bridges still structurally deficient, new analysis finds
    February 19, 2016
    According to the US Department of Transportation's recently-released 2015 National Bridge Inventory database, there were 2,574 fewer structurally deficient bridges in 2015 compared to the number in 2014. However, there are still 58,500 on the structurally deficient list and at the current pace of bridge investment it would take at least 21 years before they were all replaced or upgraded. The American Road & Transportation Builders Association (ARTBA), which conducts an annual review of state bridge da