Skip to main content

Dubai RTA implementing integrated synchronisation for signalised junctions

The number of signalised junctions in Dubai has increased to 412, most of which are controlled by the Traffic Control System Centres of the Roads & Transport Authority (RTA). According to engineer Maitha bin Udai, CEO of RTA's Traffic and Roads Agency, the agency is currently working on an integrated project to synchronise and upgrade databases for 180 main signalised junctions. Some 60 of them will be completed in the current year, and 120 next year, she said, adding that the implementation of the project
July 23, 2012 Read time: 2 mins
The number of signalised junctions in Dubai has increased to 412, most of which are controlled by the Traffic Control System Centres of the 6700 Dubai's Roads and Transport Authority (RTA).

According to engineer Maitha bin Udai, CEO of the RTA's Traffic and Roads Agency, the agency is currently working on an integrated project to synchronise and upgrade databases for 180 main signalised junctions. Some 60 of them will be completed in the current year, and 120 next year, she said, adding that the implementation of the project was in response to recommendations in a traffic study conducted by the RTA to improve the performance of the traffic signals in the emirate. The experimental studies conducted on some junctions in Dubai showed that the trip time dropped by 15 per cent in areas covered by the study and in which synchronisation and database upgrades were undertaken.

"The Agency attends to training engineers and operators of the intelligent traffic systems on a number of traffic plans for synchronising the timing of traffic lights, where such plans may in some junctions reach six different plans for a single traffic light per day, depending on peak hours and frequency of congestion in roads leading to junctions,” said Engineer Maitha. “The Agency also trains them on the latest techniques of signals timings, and methods of linking a number of traffic lights. The RTA is keen that the lapse time for all directions shall not exceed 240 seconds and that the connected traffic signals should not exceed 16 signals," she continued.

In respect of the traffic control centre, Maitha said the capacity of devices operating the signalling system has been upgraded at the control centre in order to manage the current and future of signalised junctions. "The Centre is equipped with the latest version of data analysis system to analyse information transmitted by sensors. The number of surveillance cameras increased to 240 cameras, and the Agency is moving ahead with plans to improve the calibre of traffic services rendered to the public," said Maitha.

For more information on companies in this article

Related Content

  • Real-time driving data reveals rush hour congestion on London’s road during tube strike
    February 6, 2017
    Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action. According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. Th
  • Trans-Pennine road tunnel routes shortlisted, may include special lighting, caverns
    August 19, 2016
    Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades. The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists. All five routes join th
  • EU support for transport links in Vienna, Sweden, Finland
    November 15, 2013
    The European Union will use over US$15 million from the Ten-T programme to co-finance two initiatives for the extension of Vienna’s tri-modal port container handling capacity and a project to upgrade the transport link between northern Sweden and western Finland. The project to extend Vienna’s tri-modal port will receive funds of over US$7 million and includes studies and works which will help eliminate major bottlenecks in the port's transfer and combination capacity. The studies will plan and design
  • Will mobile apps kick-start mobility pricing?
    January 5, 2016
    Thomas Hallauer from Ptolemus believes trials of connected road charging services will show the pay per mile concept will go much further than previously thought. Drivers are progressively becoming directly connected to the transport infrastructure and while the methods are changing, the innovation is really in the models rather than the technology.