Skip to main content

Dubai RTA implementing integrated synchronisation for signalised junctions

The number of signalised junctions in Dubai has increased to 412, most of which are controlled by the Traffic Control System Centres of the Roads & Transport Authority (RTA). According to engineer Maitha bin Udai, CEO of RTA's Traffic and Roads Agency, the agency is currently working on an integrated project to synchronise and upgrade databases for 180 main signalised junctions. Some 60 of them will be completed in the current year, and 120 next year, she said, adding that the implementation of the project
July 23, 2012 Read time: 2 mins
The number of signalised junctions in Dubai has increased to 412, most of which are controlled by the Traffic Control System Centres of the 6700 Dubai's Roads and Transport Authority (RTA).

According to engineer Maitha bin Udai, CEO of the RTA's Traffic and Roads Agency, the agency is currently working on an integrated project to synchronise and upgrade databases for 180 main signalised junctions. Some 60 of them will be completed in the current year, and 120 next year, she said, adding that the implementation of the project was in response to recommendations in a traffic study conducted by the RTA to improve the performance of the traffic signals in the emirate. The experimental studies conducted on some junctions in Dubai showed that the trip time dropped by 15 per cent in areas covered by the study and in which synchronisation and database upgrades were undertaken.

"The Agency attends to training engineers and operators of the intelligent traffic systems on a number of traffic plans for synchronising the timing of traffic lights, where such plans may in some junctions reach six different plans for a single traffic light per day, depending on peak hours and frequency of congestion in roads leading to junctions,” said Engineer Maitha. “The Agency also trains them on the latest techniques of signals timings, and methods of linking a number of traffic lights. The RTA is keen that the lapse time for all directions shall not exceed 240 seconds and that the connected traffic signals should not exceed 16 signals," she continued.

In respect of the traffic control centre, Maitha said the capacity of devices operating the signalling system has been upgraded at the control centre in order to manage the current and future of signalised junctions. "The Centre is equipped with the latest version of data analysis system to analyse information transmitted by sensors. The number of surveillance cameras increased to 240 cameras, and the Agency is moving ahead with plans to improve the calibre of traffic services rendered to the public," said Maitha.

For more information on companies in this article

Related Content

  • Big data bonus for Dublin’s buses
    August 19, 2014
    Dublin’s smart research partnership speeds buses More than 50% of people travelling into and across the Irish capital rely on public transport, and four out of 10 these use buses meaning Dublin Bus carries some 120 million passengers a year.
  • Bogotá sets tentative timeline for metro tender
    February 6, 2015
    Bogotá mayor Gustavo Petro has announced that a tender for the Colombian capital's Line No. 1 metro project, which has been in the planning for a decade, could be issued by July. However, the final timeline for bidding will depend on whether the city is first able to line up financing for the project, the mayor added, according to local press reports. Building the metro line is expected to cost US$7.5 billion, or about double the previous estimates. In its current form, the metro line will extend some
  • Open road tolling: safer with less congestion
    January 30, 2012
    Michael J. Davis of PBS&J looks at the positive effect that open road tolling can have on safety
  • Closer running and investment to boost capacity of Britain’s railways, says new report
    January 4, 2017
    Closer running to increase the frequency of train services, alongside investment in new railway infrastructure, are recommendations to boost UK rail capacity in the new report by the Institution of Mechanical Engineers and the Transportation Research Laboratory (TRL). The report, Increasing capacity; putting Britain’s railways back on track, makes recommendations to meet growing rail passenger demand, which is forecast to double by the 2040s. The Institution of Mechanical Engineers and TRL are offering s