Skip to main content

Dubai invests £125m in expanding smart traffic systems

The Road and Transport Authority (RTA) of Dubai has approved the expansion of its smart traffic systems project valued at د.إ 590 million (£125m). RTA says the initiative also includes the development of a control centre for traffic management in the Al Barsha area to help manage bottlenecks. The project’s initial package includes the installation of traffic monitoring systems and information gathering, including the installation of cameras, vehicle detectors, Bluetooth devices and weather sensors.
November 21, 2018 Read time: 2 mins

The Road and Transport Authority (RTA) of Dubai has approved the expansion of its smart traffic systems project valued at د.إ 590 million (£125m).

RTA says the initiative also includes the development of a control centre for traffic management in the Al Barsha area to help manage bottlenecks.

The project’s initial package includes the installation of traffic monitoring systems and information gathering, including the installation of cameras, vehicle detectors, Bluetooth devices and weather sensors.

The second package, a dynamic messaging system, covers the implementation of 112 signs that provide real-time information to drivers on road conditions.

Thirdly, infrastructure related to the project such as civil works, fibre-optic lines and power and a distribution network will be implemented.

The fourth package entails an advanced traffic management system which is expected to support decision making and integrate with field equipment and other centres.

Al Tayer, director general and chairman of the board of directors at RTA, says the final phase includes the implementation of the control centre to accommodate the expected increase in new and future smart traffic systems. It will feature systems in the control room which are easy to use.

UTC

Related Content

  • June 1, 2016
    B&C Transit modernises Miami-Dade Metrorail’s control systems
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.
  • December 17, 2014
    Abu Dhabi seeks safe and efficient multi-modal ITS solutions
    Abu Dhabi’s Department of Transport is planning to roll out its second phase ITS Strategy and Action Plan through to 2019 which will deploy a host of innovative multimodal ITS solutions. The United Arab Emirates (UAE) is continuing to experience rapid growth in both its economy and population and none more so than its capital, Abu Dhabi. To cope with the current expansion, and in anticipation of future growth, the Abu Dhabi Surface Transport Master Plan has been devised by its Department of Transport and th
  • July 17, 2012
    Development of cooperative driving applications for work zones
    The German AKTIV project is researching several cooperative driving applications for use in work zones. PTV's Michael Ortgiese details progress. The steep increases in traffic volumes predicted back in the early 1990s have unfortunately been proven to be more than accurate. In Germany, the AKTIV project continues to look into cooperative technologies' potential to reduce the impact of those increased traffic volumes and keep traffic moving despite limitations in infrastructure capacity.
  • July 23, 2012
    Dubai RTA implementing integrated synchronisation for signalised junctions
    The number of signalised junctions in Dubai has increased to 412, most of which are controlled by the Traffic Control System Centres of the Roads & Transport Authority (RTA). According to engineer Maitha bin Udai, CEO of RTA's Traffic and Roads Agency, the agency is currently working on an integrated project to synchronise and upgrade databases for 180 main signalised junctions. Some 60 of them will be completed in the current year, and 120 next year, she said, adding that the implementation of the project