Skip to main content

Drivers urged: ‘Don’t put road workers lives at risk’

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
May 23, 2018 Read time: 2 mins

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says 8101 Highways England.

Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures.

Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join.

One lorry driver travelled through the construction area without stopping - forcing workers to get out the way quickly - while another incident involved a motorcyclist swerving around a worker. Meanwhile, a 4x4 driver swore at a worker who tried to offer advice before driving away.

Highways England says there are nearly 300 incidents per week of road users driving into coned-off construction areas where road workers are based at motorways and major A roads.

In addition, findings revealed there were over 1,200 incidents in the north-west of England alone during a three-month period last year.

Phil Tyrrell, Highways England project manager for the Switch Island scheme, said the upgrade will offer better journeys through the junction. 

“Drivers who selfishly and illegally ignore the closures to force their way through are putting both their lives and those of our road workers at risk – all to save a few minutes on their journeys.”

The Switch Island improvement scheme includes changes to the road layout and lane markings, new barriers between carriageways, coloured high friction surfaces, better signs and a new 400m shared cycle path.

LED lights similar to an airport runway are also being implemented in the road surface which will light up when traffic lights turn green to help drivers see which lane to follow.

New road signs will be displayed on three new gantries over the A5036 Dunnings Bridge Road, A59 Ormskirk Road and A5758 Brooms Cross Road to help drivers get into the correct lane to continue their journeys.

For more information on companies in this article

Related Content

  • New Highways England chief executive announced
    June 22, 2015
    Jim O’Sullivan has been appointed as the new chief executive of Highways England and will lead the government-owned company which is responsible for delivering US$17 billion of improvements to England’s motorways and major A roads by 2020. O’Sullivan is an experienced engineer who is expected bring significant leadership experience the role. He has a broad range of experience working on safety critical transport projects, in the utilities industries and in world renowned businesses including British Airw
  • Intelligent parking guidance relieves congestion, reduces costs
    July 24, 2012
    O R Tambo International Airport, near the city of Johannesburg, is the largest airport in Africa. It serves as the primary airport for domestic and international travel to/from South Africa and is one of 10 airports operated by Airports Company South Africa (ACSA). This airport places a massive demand on road infrastructure and parking facilities since a majority of travellers get to the airport by motor vehicle. The demand for parking left many people searching for a parking space for eight minutes or more
  • Cheshire’s M6 to become smart motorway
    July 2, 2015
    Draft regulations to introduce variable mandatory speed limits as part of the planned smart motorway upgrade to 18 and a half miles of the M6 in Cheshire were published this week for consultation with key stakeholders. Highways England is planning to start construction work on the US$299 to US$427 million project between junction 16 at Crewe and junction 19 at Knutsford later this year. The hard shoulder will be converted into a permanent extra running lane and smart motorway technology installed to give
  • Highways England awards new-style framework contracts
    January 30, 2017
    Highways England has teamed up with 18 companies to help improve journeys for road users in Cumbria, North Lancashire and the North East of England. A new style framework, worth up to US$543 million (£434 million) will start on 1 April 2017. The Construction Works Framework covers 10 different specialisms of work, is split into 15 separate lots and will run for four years. The framework covers a range of activities that include renewal work to roads and bridges, and improvement schemes on the Highways