Skip to main content

Drivers urged: ‘Don’t put road workers lives at risk’

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
May 23, 2018 Read time: 2 mins

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says 8101 Highways England.

Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures.

Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join.

One lorry driver travelled through the construction area without stopping - forcing workers to get out the way quickly - while another incident involved a motorcyclist swerving around a worker. Meanwhile, a 4x4 driver swore at a worker who tried to offer advice before driving away.

Highways England says there are nearly 300 incidents per week of road users driving into coned-off construction areas where road workers are based at motorways and major A roads.

In addition, findings revealed there were over 1,200 incidents in the north-west of England alone during a three-month period last year.

Phil Tyrrell, Highways England project manager for the Switch Island scheme, said the upgrade will offer better journeys through the junction. 

“Drivers who selfishly and illegally ignore the closures to force their way through are putting both their lives and those of our road workers at risk – all to save a few minutes on their journeys.”

The Switch Island improvement scheme includes changes to the road layout and lane markings, new barriers between carriageways, coloured high friction surfaces, better signs and a new 400m shared cycle path.

LED lights similar to an airport runway are also being implemented in the road surface which will light up when traffic lights turn green to help drivers see which lane to follow.

New road signs will be displayed on three new gantries over the A5036 Dunnings Bridge Road, A59 Ormskirk Road and A5758 Brooms Cross Road to help drivers get into the correct lane to continue their journeys.

For more information on companies in this article

Related Content

  • LiDAR sets its sights on future problems
    February 23, 2017
    AAdvances in LiDAR are helping transport authorities improve services and identify potential problem areas, as geospatial technology expert Dr Neil Slatcher explains. The effects of climate change on the transport infrastructure have long been a cause of concern within the transportation sector - and not only on the structures themselves but also on the surrounding areas. This year, those concerns have become reality with landslides, structural collapses and surfacing issues impacting services across the wo
  • Contracts awarded for London’s traffic signals upgrade
    July 18, 2014
    Transport for London (TfL) has awarded new traffic signals maintenance contracts, worth around US$542 million for up to eight years, which will see the capital’s 6,000 traffic signals upgraded and maintained to the latest, greenest standards. Awarded to Telent Technology Services for west and south-west London, Siemens for north and north-west London and Cubic Transportation Systems for south-east London, the new Traffic Control Management Services contracts will help expand the use of intelligent traf
  • Section of M6 motorway to be made ‘smart’
    November 1, 2013
    A section of the M6 motorway in the UK between junctions 10a and 13 is to be upgraded to a smart (managed) motorway with all-lane running. This section of the motorway is a major strategic route, carrying around 120,000 vehicles per day.
  • ITS asset management matters
    April 26, 2013
    Maintenance of on-road ITS kit needs to become more sophisticated; while new technologies can deliver better road maintenance. David Crawford investigates both sides of the issue "Good information is key to effective ITS asset maintenance,” says Ian Routledge of the Ian Routledge Consultancy (IRC), whose Imtrac (Information Management for TRAffic Control) system is poised for European expansion. Developed as an ‘intelligent filing cabinet’ for storing information about on-road equipment, the online database