Skip to main content

Drivers urged: ‘Don’t put road workers lives at risk’

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
May 23, 2018 Read time: 2 mins

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says 8101 Highways England.

Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures.

Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join.

One lorry driver travelled through the construction area without stopping - forcing workers to get out the way quickly - while another incident involved a motorcyclist swerving around a worker. Meanwhile, a 4x4 driver swore at a worker who tried to offer advice before driving away.

Highways England says there are nearly 300 incidents per week of road users driving into coned-off construction areas where road workers are based at motorways and major A roads.

In addition, findings revealed there were over 1,200 incidents in the north-west of England alone during a three-month period last year.

Phil Tyrrell, Highways England project manager for the Switch Island scheme, said the upgrade will offer better journeys through the junction. 

“Drivers who selfishly and illegally ignore the closures to force their way through are putting both their lives and those of our road workers at risk – all to save a few minutes on their journeys.”

The Switch Island improvement scheme includes changes to the road layout and lane markings, new barriers between carriageways, coloured high friction surfaces, better signs and a new 400m shared cycle path.

LED lights similar to an airport runway are also being implemented in the road surface which will light up when traffic lights turn green to help drivers see which lane to follow.

New road signs will be displayed on three new gantries over the A5036 Dunnings Bridge Road, A59 Ormskirk Road and A5758 Brooms Cross Road to help drivers get into the correct lane to continue their journeys.

For more information on companies in this article

Related Content

  • Slow development of Europe's road user charging
    April 24, 2013
    Delegates convened in Brussels for Europe’s 10th annual Road User Charging Conference in March, when both positive and negative developments came to light for advocates of more widespread introduction of RUC. Jon Masters reports. Goings on across Europe in recent months have again demonstrated how very sensitive road user charging (RUC) is politically. At the 10th annual Road User Charging Conference in Brussels at the beginning of March, a Danish delegation was notable for its absence, but Belgian governme
  • Cohda trial proves C-ITS can work in tunnels
    August 29, 2019
    Connected cars require uninterrupted signals to ensure driving safety. Going underground creates problems – but a trial in Norway suggests that there might be light at the end of the tunnel… As connectivity becomes increasingly important for transportation – in particular for connected and autonomous vehicles (C/AVs) - the problem of ‘blackspots’ and dead zones where signals fail or drop out is a pressing one. But developments early this year suggest that advances in technology might be on the brink of d
  • Enforcement cuts distracted driving dramatically
    April 17, 2012
    The government of Indonesia says it is working to reduce the number of road deaths in the country by 50 per cent by 2020 and by 80 per cent by 2035. To achieve this, the government will be upgrading the road infrastructure as well as introducing a road safety programme that will run over a ten-year and 25-year plans, starting this year. The programme will be overseen by the National Planning Development Board with involvement of the national police as well as the public works, transportation, national educa
  • State panel looks for ways to fix roads
    September 4, 2014
    A special panel, the Transportation Funding Task Force, which includes legislative leaders and others, is about to launch a study of ways to boost state aid for Louisiana's often-criticised road and bridge system. "There is not a legislator across the state that does not have some kind of issue with getting a project done, starting a project, finishing a project," said state Representative Karen St Germain, chairwoman of the House Transportation Committee and a member of the panel.