Skip to main content

Drivers urged: ‘Don’t put road workers lives at risk’

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
May 23, 2018 Read time: 2 mins

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says 8101 Highways England.

Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures.

Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join.

One lorry driver travelled through the construction area without stopping - forcing workers to get out the way quickly - while another incident involved a motorcyclist swerving around a worker. Meanwhile, a 4x4 driver swore at a worker who tried to offer advice before driving away.

Highways England says there are nearly 300 incidents per week of road users driving into coned-off construction areas where road workers are based at motorways and major A roads.

In addition, findings revealed there were over 1,200 incidents in the north-west of England alone during a three-month period last year.

Phil Tyrrell, Highways England project manager for the Switch Island scheme, said the upgrade will offer better journeys through the junction. 

“Drivers who selfishly and illegally ignore the closures to force their way through are putting both their lives and those of our road workers at risk – all to save a few minutes on their journeys.”

The Switch Island improvement scheme includes changes to the road layout and lane markings, new barriers between carriageways, coloured high friction surfaces, better signs and a new 400m shared cycle path.

LED lights similar to an airport runway are also being implemented in the road surface which will light up when traffic lights turn green to help drivers see which lane to follow.

New road signs will be displayed on three new gantries over the A5036 Dunnings Bridge Road, A59 Ormskirk Road and A5758 Brooms Cross Road to help drivers get into the correct lane to continue their journeys.

For more information on companies in this article

Related Content

  • Autopilot highlights shape of Things
    March 30, 2020
    Driverless vehicles require rich data to operate safely, and a European consortium is harnessing the Internet of Things to help.
  • New technology set to transform England’s motorways
    October 12, 2015
    A new high-tech intelligent transport system is set to transform the way traffic is managed on England’s motorways and major A roads. Highways England has awarded a US$46 million contract to Austria-based firm Kapsch TrafficCom to install the system at its regional control centre in Wakefield, West Yorkshire, which will then be rolled out to the rest of the country. The new technology will integrate a wide range of functions and manage the existing large quantity of different roadside devices. The sys
  • Here’s HD AV map prepared for 5G
    June 17, 2019
    The emergence of 5G may not be necessary to provide a high-definition map for autonomous driving, says Matt Preyss from Here Technologies. Ben Spencer asks why 5G is a hot topic worldwide, with the potential for faster transfer of information eagerly awaited by those convinced that it will be a game-changer for the ITS industry. High-definition (HD) maps are essential to allow autonomous vehicles (AVs) to understand their environment, and operate safely within it in relation to other road users and p
  • FTA calls for greater reliability on road network following improvements at Dartford
    October 14, 2015
    Drivers using the Dartford Crossing at peak times are saving around an hour and a half every week thanks to Dart Charge, according to Highways England. New figures released by Highways England show that journeys over the Dartford Crossing, which cost £62million (US$95 million) to convert to free-flow tolling, are up to 56 per cent faster than before payment barriers were removed. Drivers at peak times save up to 14 minutes southbound and seven minutes northbound.