Skip to main content

Drivers urged: ‘Don’t put road workers lives at risk’

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
May 23, 2018 Read time: 2 mins

A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says 8101 Highways England.

Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures.

Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join.

One lorry driver travelled through the construction area without stopping - forcing workers to get out the way quickly - while another incident involved a motorcyclist swerving around a worker. Meanwhile, a 4x4 driver swore at a worker who tried to offer advice before driving away.

Highways England says there are nearly 300 incidents per week of road users driving into coned-off construction areas where road workers are based at motorways and major A roads.

In addition, findings revealed there were over 1,200 incidents in the north-west of England alone during a three-month period last year.

Phil Tyrrell, Highways England project manager for the Switch Island scheme, said the upgrade will offer better journeys through the junction. 

“Drivers who selfishly and illegally ignore the closures to force their way through are putting both their lives and those of our road workers at risk – all to save a few minutes on their journeys.”

The Switch Island improvement scheme includes changes to the road layout and lane markings, new barriers between carriageways, coloured high friction surfaces, better signs and a new 400m shared cycle path.

LED lights similar to an airport runway are also being implemented in the road surface which will light up when traffic lights turn green to help drivers see which lane to follow.

New road signs will be displayed on three new gantries over the A5036 Dunnings Bridge Road, A59 Ormskirk Road and A5758 Brooms Cross Road to help drivers get into the correct lane to continue their journeys.

For more information on companies in this article

Related Content

  • Government to reform strategic road network in England
    July 17, 2013
    The national network of motorways and trunk roads in England will get extra lanes, smoother, quieter surfaces, improved junctions and new sections in key areas under a plan launched this week by Transport Secretary Patrick McLoughlin. £28 (US$42.5) billion of investment, which includes a trebling of funding for motorways and major A-roads, will lead to the biggest ever upgrade of the existing network. The focus will be on cutting congestion and minimising the environmental impact of roads, including an extr
  • NHTSA: Improve safety - but don't stifle innovation
    June 6, 2018
    Road safety is vital – but it must be possible to achieve it without stifling innovation. That was the central message from safety supremo Heidi King in her keynote speech at the official opening of ITS America’s 2018 annual meeting in Detroit. King, the deputy administrator of the National Highway Traffic Safety Administration (NHTSA), said that new technology must be embraced: “Vehicle automation is a central focus because of its life-saving potential.” She emphasised that NHTSA – part of the US Departmen
  • First UK variable bus lane opens
    April 17, 2012
    UK highways servicing contractor, Ringway, has successfully delivered a scheme on behalf of Solihull Council to improve travel links in the Solihull area that includes a new variable bus lane, the first of its kind in the UK.The variable bus lane uses the Ringway-installed CCTV and digital signage to adjust the status of the bus lane in order that it does not remain empty during peak traffic times. “This pioneering bus lane is just one aspect of the ANITA Project, which has seen Ringway provide a dedicated
  • Continental and BMW Group partner on automated driving
    February 27, 2013
    German automotive supplier Continental and BMW Group are pooling their development capacities to define the long-term prerequisites for series introduction of highly automated driving on European freeways. The two companies have signed an agreement to jointly develop an electronic co-pilot for this purpose, with the aim of paving the way to automated driving functions beyond the year 2020. “Automated driving is a key element in future mobility. It will significantly enhance safety, comfort and efficiency on