Skip to main content

Drivers are avoiding hard shoulders converted to running lanes

Two fifths (38 per cent) of UK drivers say they will not drive in lane one of a smart motorway where the hard shoulder has been permanently converted into a running lane, according to a survey of more than 18,000 drivers conducted by the AA.
July 4, 2017 Read time: 2 mins

Two fifths (38 per cent) of UK drivers say they will not drive in lane one of a smart motorway where the hard shoulder has been permanently converted into a running lane, according to a survey of more than 18,000 drivers conducted by the 1459 AA.

This compares to 85 per cent of drivers who say they would drive in lane one of a motorway with a permanent hard shoulder.

When asked why they avoid using the new running lanes on smart motorways, more than a third said that they wouldn’t use lane one ‘for fear of coming across a broken down vehicle'. One in ten said that they believed lane one was ‘the lorry lane’.

Documents from 8101 Highways England analysing two stretches of M25 smart motorway scheme indicate that traffic flow is significantly lower on lane one than other lanes within the scheme.

Edmund King, AA president, says: “Despite all the talk about improving traffic flow and easing congestion by having more lanes, it seems that drivers are voting with their wheels by avoiding converted hard shoulders and clogging up the other lanes.

“Drivers are fearful that, with the current lack of Emergency Refuge Areas, they will come across broken down vehicles and have little chance to avoiding collisions. We need more education for drivers using smart motorways as clearly they do not trust the schemes in their current state.”

For more information on companies in this article

Related Content

  • EV sales stalling in the UK
    April 17, 2012
    The number of electric cars sold in the UK has fallen by over 50 per cent to just 215 in the first three months of the year despite Government incentives, according to figures from the RAC Foundation.Since 1 January, individuals and businesses have been able to claim a discount of up to £5,000 (US$8,193) on cars producing 75 g CO2/km or less under the Government’s Plug-In Car Grant scheme. A total of 680 cars have been purchased under the programme, taking the number of electric cars registered in the UK to
  • Value of time – the key decider
    March 4, 2014
    The ‘value of time’ concept can be a vital decider in prioritising transport projects, as Lorenzo Casullo and Serbjeet Kohli of Steer Davies Gleave explain. How much do travellers value their time and how much would they be willing to pay for a better and faster transport option? For many years Steer Davies Gleave (SDG) has been collecting this type of information from thousands of people across the world as it researches travellers’ behaviour. And given the importance of this parameter for transport mo
  • UK’S infrastructure on the up, but now it’s all about delivery – CBI/AECOM
    November 7, 2016
    Almost half of firms believe the UK’s infrastructure has improved over the past five years, but only a quarter think it will pick up in the next five years, and two thirds suspect it will hamper the country’s international competitiveness in the coming decades, according to the 2016 CBI/AECOM Infrastructure Survey.
  • New system to prevent Hazchem and over-height vehicles entering tunnel
    August 20, 2015
    An impending move to free-flow charging prompted a search for automated dangerous goods identification and over-height detection systems at the Thames Crossing to the east of London. Manned toll booths are increasingly being consigned to history by the onslaught of all-electronic charging. However, a secondary function of the traditional manned plazas has been to prevent non-compliant vehicles using the facility or to tell a driver that that they need to use a specific lane or wait for an escort. Automating