Skip to main content

Developing Oman’s integrated transportation infrastructure

Oman has committed about US$14.8 billion, almost half of the country’s eight five-year development Plan for 2011-2015, to overhauling roads, ports and airports with the objective of linking the three modes of transport to improve interconnectivity. The third annual Oman Land Transport Infrastructure Summit 2013, 8-11 September, will spotlight the implementation and construction of transportation networks across the Sultanate with a focus on land transportation infrastructure, including roads, bridges, tunne
August 6, 2013 Read time: 2 mins
Oman has committed about US$14.8 billion, almost half of the country’s eight five-year development Plan for 2011-2015, to overhauling roads, ports and airports with the objective of linking the three modes of transport to improve interconnectivity.

The third annual %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 4 9687 0 oLinkExternal Oman Land Transport Infrastructure Summit www.itsinternational.com/diary false /diary/?id=258d6145-25ed-4b25-9217-0d8651470da0 true false%>2013, 8-11 September, will spotlight the implementation and construction of transportation networks across the Sultanate with a focus on land transportation infrastructure, including roads, bridges, tunnels and railway.

Around US$1.1 billion worth of contracts were awarded in the road sector in 2011, and the road sector is expected to continue to play an important role in the construction sector in 2013 with firms submitting bids for more than US $600 million worth of roads projects in the fourth quarter of 2011. Infrastructure projects that have been given top priority in the 2012 budget include Al Batinah Expressway with an allocated budget of US$2.6 billion. The US$10 billion Oman railway network, to be completed by 2017, is a key component in facilitating domestic, regional and international connectivity and increasing trade exchange while developing industrial activities in the Sultanate

Related Content

  • HNTB smart truck parking saves time and money
    September 7, 2014
    While truck parking may not be at the top of most transportation professionals’ minds, it is a subject HNTB is highlighting at its booth – and for good reasons. Commercial truck drivers spend 30 minutes searching for a place to park their rigs, often resorting to highway shoulders, exit ramps or the more risky abandoned and commercial lots.
  • Aselsan installs Turkey’s first multi-lane free-flow tolling
    March 24, 2014
    Commuters in Istanbul using the bridges across the Bhosphorus Strait are set to benefit from Turkey’s first multi-lane free flow tolling system being installed by toll system manufacturer Aselsan. The company has already installed the initial part of the system on the northbound lanes of the Fatih Sultan Mehmet (FSM) Bridge (which carries 120,000 vehicles per day) and the system will be ready for operation in June.
  • PDTS highlight Wallbox vehicle charging system at ITS World Congress
    September 26, 2012
    Austrian company PDTS will highlight its Wallbox PC 310/320, an intelligent, network- and customer-friendly electric vehicle (EV) charging system for the private and semi-public sector. Using type 1 and 2 e-mobility connectors to ensure broad charge compatibility, the configuration of the PC 310/320 is standard IEC 61851-1 compliant with Mode 3 charging, enabling safe and convenient charging of electric vehicles at speeds much faster than conventional electrical outlets.
  • Over half Victorian motorists no longer consider petrol combustion engines in next purchase, Australia
    October 9, 2017
    More than half of the 15, 047 Victorian motorists who participated in EastLink’s first annual self-driving vehicle survey are no longer considering a traditional petrol combustion engine for their next car purchase. The findings come as toll route operator announced the overall results from the survey. EastLink’s survey, with the support from the Australian Road Research Board, was conducted online over a 4-week period for motorists between 11 September and 8 October.