Skip to main content

DDOT releases new Capital Bikeshare locations

Washington’s District Department of Transportation (DDOT) has announced proposed locations for fifty-four new Capital Bikeshare (CaBi) stations to be installed this winter in the District of Columbia. The list includes proposed new stations in all eight wards of the city. DDOT selected the locations from a longer list of suggested locations submitted by the public over the past two years. DDOT evaluated the locations using several criteria, including population density, employment density, bike-to-work rate
December 24, 2012 Read time: 2 mins
Washington’s 2134 District Department of Transportation (DDOT) has announced proposed locations for fifty-four new Capital Bikeshare (CaBi) stations to be installed this winter in the District of Columbia. The list includes proposed new stations in all eight wards of the city.

DDOT selected the locations from a longer list of suggested locations submitted by the public over the past two years. DDOT evaluated the locations using several criteria, including population density, employment density, bike-to-work rate, proximity to metro, and proximity to other Bikeshare stations. Residents also ‘voted’ for their preferences using an interactive crowdsourcing map.

“These new locations will mean a 40 per cent increase in the number of CaBi stations in DC,” said DDOT Director Terry Bellamy. “Combined with new stations in Arlington, Alexandria and soon in Montgomery County, we’re building a robust and truly regional system.”

The proposed stations are in a mix and new and existing bikeshare neighbourhoods. “We need to balance the desire to expand into new areas with the need for more docks and bikes in existing areas, particularly downtown, where demand is heaviest.” said Chris Holben, DDOT Project Manager for Capital Bikeshare. “Basically, for every ‘expansion’ station we also need more spaces downtown to keep up with demand.”
DDOT plans to start installing new stations and bikes in January and finish in March. Locations not selected in this round will be considered for the next round.

For more information on companies in this article

Related Content

  • Conscience versus convenience
    June 8, 2015
    David Crawford looks at new ways forward for public transport. By 2025, nearly 60% of the world’s population will be living in towns and cities, increasing their extent and density, and the journeys that people make within and between them. In response, the International Association of Public Transport (UITP) wants to see public transport’s global modal share doubling (PTx2) by the same date. “Success in 2025,” a spokesperson told ITS International, “will save 170 million tonnes of oil equivalent and 550
  • ITS America applauds latest TIGER grants
    October 30, 2015
    US Transportation Secretary Anthony Foxx has announced US$500 million in TIGER (Transportation Investment Generating Economic Recovery) 2015 grants for 39 transportation projects in 34 states, some projects spanning several states. In selecting projects, Foxx prioritised the extent to which the proposed project strengthens access to opportunities through transportation improvements.
  • New York State DOT awards IRD traffic data collection contract
    February 3, 2016
    The New York State Department of Transportation (NYSDOT) has awarded International Road Dynamics (IRD) a five-year traffic data collection maintenance and upgrade contract valued at US$4.8 million. Under this agreement, IRD will install, upgrade, repair, operate and maintain the NYSDOT permanent data collection sites, the majority of which have IRD equipment, located in Metro New York City, Nassau, Suffolk, Rockland and Westchester Counties. NYSDOT uses these sites to collect, summarise and interpret
  • Rochester solves $8.5m transit question
    October 22, 2018
    RTS in Rochester, New York, saves by working with Conduent to upgrade its CAD/AVL systems rather than ripping them up and replacing them. Andrew Bardin Williams hops on for a ride. What to do, what to do?” It’s a question every transportation official must ask when faced with legacy assets, equipment and software that are nearing the end of their useful life. Nothing lasts forever, right? Freeways need to be repaired, bridges replaced, traffic management software updated and railway cars turned into