Skip to main content

Dartford Crossing gets enhanced PA system

A new traffic safety system installed on The Dartford Crossing, the busiest estuarial crossing in the UK, is benefitting from a high quality public address (PA) system to communicate with drivers in the event of an incident. To combat the noisy road and traffic conditions, PEL Services installed a Bosch Praesideo digital PA system, with master and slave network-controllers and incorporating ambient noise sensing to automatically adjust sound levels to compensate for substantial variations in the levels o
May 25, 2016 Read time: 2 mins
A new traffic safety system installed on The Dartford Crossing, the busiest estuarial crossing in the UK, is benefitting from a high quality public address (PA) system to communicate with drivers in the event of an incident.

To combat the noisy road and traffic conditions, 8431 PEL Services installed a 311 Bosch Praesideo digital PA system, with master and slave network-controllers and incorporating ambient noise sensing to automatically adjust sound levels to compensate for substantial variations in the levels of background traffic noise.  The system has been set to maintain the sound level at 5dB above ambient levels, in real time, to ensure announcements are audible but not anti-socially loud.

Twelve Bosch LBC 3432-03 unidirectional projection speakers have been used with Praesideo at four locations; three speakers on each pole, at different heights to cater for the varying vehicle heights.  The speakers have been configured in a contingent redundant arrangement, as an additional fail-safe. There are three amplifiers for each location including one on standby and the entire system is connected to an uninterrupted power supply.

For more information on companies in this article

Related Content

  • FTA disappointed at Dartford free-flow toll delay
    September 22, 2014
    ‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
  • Qatar invests $70 billion to pave the way to world beating transportation
    July 26, 2013
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in
  • Tunnel simulators vital for real world tunnel management
    January 23, 2012
    Guillaume Ponsar, tunnel safety engineer with Egis Road Operation, writes about the advantages to be gained from the use of tunnel simulators. Major tunnel disasters over the last decade and more have shown how swiftly and badly a simple crash or fire may evolve should the wrong actions be taken by control room operators or traffic managers. Global safety issues and the reactions of operations staff have now become the principal concerns for Operations and Maintenance (O&M) service providers. As a result, n
  • FTA calls for greater reliability on road network following improvements at Dartford
    October 14, 2015
    Drivers using the Dartford Crossing at peak times are saving around an hour and a half every week thanks to Dart Charge, according to Highways England. New figures released by Highways England show that journeys over the Dartford Crossing, which cost £62million (US$95 million) to convert to free-flow tolling, are up to 56 per cent faster than before payment barriers were removed. Drivers at peak times save up to 14 minutes southbound and seven minutes northbound.