Skip to main content

Cycle safety improvements coming for Dunedin, New Zealand

Work is set to start next month on a cycleway through central Dunedin, New Zealand, that aims to improve safety for cyclists, pedestrians and all road users. Fulton Hogan has been awarded a (US$6 million (NZ$8 million) contract to build new cycle lanes on the north and southbound streets of the State Highway 1 one-way system between the Dunedin Botanical Gardens and Queens Gardens. The work involves replacement of the existing painted cycle lanes, which sit directly next to busy traffic lanes and placing ne
July 21, 2017 Read time: 2 mins
Work is set to start next month on a cycleway through central Dunedin, New Zealand, that aims to improve safety for cyclists, pedestrians and all road users.


Fulton Hogan has been awarded a (US$6 million (NZ$8 million) contract to build new cycle lanes on the north and southbound streets of the State Highway 1 one-way system between the Dunedin Botanical Gardens and Queens Gardens.

The work involves replacement of the existing painted cycle lanes, which sit directly next to busy traffic lanes and placing new cycle lanes alongside the footpath, together with a series of islands to keep highway traffic and cyclists separated.

Another critical element of the work is a focus on improving pedestrian safety, with new traffic signals planned and existing traffic signal operations being upgraded to increase the protection for pedestrians when crossing.  

In addition to improving the safety of the one-way system for everyone, the new cycle lanes will create better linkages to central city locations including the hospital and the central city itself. It will also provide more convenient connections to the wider network of urban cycle routes being developed by the Dunedin City Council.  

The cycleway is part of the Urban Cycleways Programme, which is delivering US$247 million (NZ$333 million) of new cycleway projects throughout the country. This is the single biggest investment in cycling in New Zealand’s history.

UTC

Related Content

  • October 13, 2014
    Dual purpose for new weigh-in-motion site
    A new weigh-in-motion weighbridge is being installed on State Highway 1 at the Rakaia Bridge to support the introduction of high productivity motor vehicles (HPMV) on this key South Island, New Zealand, freight route. The HPMV system allows vehicles carrying a divisible load of essential goods to weigh more than the official 44 metric tonnes without a permit, but only on specified routes.
  • August 18, 2022
    $130m infrastructure spend in Vancouver
    TransLink invests in cycling paths, walkways, multi-use paths, intersections and roads
  • February 15, 2013
    Newcastle rush-hour traffic trials get the go-ahead
    Traffic trials aimed at streamlining the rush-hour commute in the UK’s north-east have been given the green light. The project in Newcastle involves new satellite navigation technology which helps drivers adjust their speed so they can pass through a series of lights on green. The European project is being led by Newcastle University and Newcastle City Council, and aims to reduce city centre congestion and pollution associated with stop-start driving. Phil Blythe, Professor of Intelligent Transport Systems
  • May 7, 2020
    Global cities transform space for post-Covid transport
    Glimpses are beginning to emerge of how European and US cities plan to change the way people travel.