Skip to main content

Cubic (ITMS) wins key London traffic signals maintenance contract

Transport for London (TfL) has awarded Cubic (ITMS), a subsidiary of Cubic Transportation Systems, a six-year contract worth some US$85 million to maintain and expand the use of intelligent traffic signals, as well as new crossings for pedestrians and cyclists, at strategic points across the city. The contract includes a provision for a further two-year extension. The Traffic Control Management Services 2 (TCMS2) contract covers the whole of London. Cubic has been assigned responsibility for 1,000 traff
August 1, 2014 Read time: 2 mins

1466 Transport for London (TfL) has awarded 378 Cubic (ITMS), a subsidiary of Cubic Transportation Systems, a six-year contract worth some US$85 million to maintain and expand the use of intelligent traffic signals, as well as new crossings for pedestrians and cyclists, at strategic points across the city.  The contract includes a provision for a further two-year extension.

The Traffic Control Management Services 2 (TCMS2) contract covers the whole of London. Cubic has been assigned responsibility for 1,000 traffic signals, variable message signs and overhead gantries across south-east London. The contract starts on 1 October 2014.

The traffic signals maintenance contract is a part of TfL’s and the London Mayor’s plan to double the investment in London’s road network from US$3.3 billion to US$6.7 billion over the next few years.

Part of TfL’s investment will go towards upgraded pedestrian crossings with countdown timers and audible alerts, efficient light emitting diode (LED) traffic lights, and cycle improvement schemes with low level cycle signals. The improvements will also see the expansion of the Split Cycle Offset Optimisation Technique (SCOOT) technology, which changes traffic signal timings based on traffic levels.

John Pickworth, sales director UK at Cubic Transportation Systems, says: “We are delighted to have been awarded this contract which is crucial in maintaining London’s road network. This contract has a larger scope than previous awards as we will have to source and deliver all required equipment and works associated with the project.”

Dana Skelley, director of Asset Management at TfL, said: “London is world-leading when it comes to traffic signals management and our new contracts will allow us to remain at the cutting edge of traffic control technology. We have a range of works planned to improve traffic signals across London and we look forward to working hard with our partners to implement them.”

For more information on companies in this article

Related Content

  • New junction on London’s Cycle Superhighway offers safety measures for cyclists
    August 25, 2015
    Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
  • TfL shortlists bidders for Electra ticketing and fare collection
    August 5, 2013
    Transport for London (TfL) has announced the shortlisted bidders for its Electra contract to take the capital’s transport ticketing systems into the next decade. Cubic Transportation Systems, LG CNS Co CNF and Scheidt and Bachmann will be invited to submit detailed bids with the contract to be awarded by October 2014. The new contract will commence from August 2015 upon the expiry of TfL’s current contract for ticketing systems. The Electra contractor will assume responsibility for the provision and mainten
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • Telent extends TfL signal deal
    September 28, 2020
    Maintenance assets include traffic signals, VMS and over-height vehicle detection systems