Skip to main content

Construction of Shenzhen expressway to commence in 2014

Shenzhen, China, will start construction of its 93 kilometre outer ring expressway, intended to become one of the most important east-west expressways in the city, next year. The US$4.3 billion project includes 82 bridges and twelve tunnels, and is expected to be completed in 2018. The expressway is viewed as the most important of the seven expressways in Shenzhen’s expressway network. It is designed with three lanes in each direction and a speed limit of 100 kilometres per hour.
September 27, 2013 Read time: 1 min
Shenzhen, China, will start construction of its 93 kilometre outer ring expressway, intended to become one of the most important east-west expressways in the city, next year.

The US$4.3 billion project includes 82 bridges and twelve tunnels, and is expected to be completed in 2018.

The expressway is viewed as the most important of the seven expressways in Shenzhen’s expressway network. It is designed with three lanes in each direction and a speed limit of 100 kilometres per hour.

“The expressway is part of the Pearl River Delta expressway network and will link with a dozen expressways and national highways. It will greatly stimulate the economy in Longgang and Pingshan,” said Tian Feng, a chief designer with the Shenzhen Urban Transportation Planning and Design Institute.

Related Content

  • North Yorkshire to benefit from major transport funding
    July 17, 2014
    Building the A684 bypass in North Yorkshire can start after the UK Department for Transport agreed to fund over US$50 million towards the full scheme cost of US$58.5 million. The bypass will remove traffic from villages and improve journey times on a vital east-west tourist route to the Yorkshire Dales. The scheme consists of a new 4.8 kilometre single carriageway road from the A684 north of Bedale to the A684 east of Leeming Bar, which links into junction 51 of the A1(M). Transport Minister Baroness
  • Dublin Tunnel gets average speed enforcement
    June 13, 2016
    Transport Infrastructure Ireland (TII) is working with the4 Irish police force, An Garda Síochána, on the installation of Ireland’s first average speed camera enforcement system, which will be deployed in the Dublin Port Tunnel. Opened in 2006, the 4.5 km tunnel forms part of the M50 C-Ring road around Dublin City. Traffic levels through the tunnel have increased by 40 per cent over the last five years and as a result there is statistically, an increase in the potential for collisions and accidents.
  • Chinese deal for UK firm
    February 13, 2012
    A UK firm has struck a major deal with China Highway Engineering Consulting Group Company (CHECSC) for road maintenance materials.
  • Spot speed deterrent proved to be transient
    October 18, 2013
    As research and trials show the benefits of average speed enforcement - David Crawford reviews developments on two continents. August 2013 saw the switch on of the Australian State of Victoria’s latest combined point-to-point (P2P) average speed enforcement (ASE) and spot camera control system. Installed on the 27km Peninsula Link to the south-east of Melbourne, the system uses high-resolution automatic number plate recognition (ANPR) cameras and optical character recognition (OCR) technology developed b