Skip to main content

Comprehensive plan to tackle Perth’s traffic congestion

The government of Western Australia has released a comprehensive plan to address traffic congestion in and around the central business district (CBD) of Perth with an AU$47.6 million (US$48.96) budget package to ensure the district has a sustainable transport network to accommodate major city projects and a growing population.
April 24, 2012 Read time: 2 mins
RSSThe government of Western Australia has released a comprehensive plan to address traffic congestion in and around the central business district (CBD) of Perth with an AU$47.6 million (US$48.96) budget package to ensure the district has a sustainable transport network to accommodate major city projects and a growing population.

“The Perth Waterfront Development, Perth City Link and Riverside projects are under way or are about to start, and are integral components to the transformation of Perth into a vibrant and modern city,” said transport minister Troy Buswell. “These projects will clearly impact on the flow of traffic in and around the city, and the CBD Transport Plan outlines how this impact will be managed and how we can better meet the needs of drivers, users of public transport, pedestrians and cyclists.”

Buswell said $47.6million from the Perth Parking Management Account would be used to introduce active traffic management and to establish incident response crews which remove broken-down vehicles.

“Active traffic management will increase road safety and traffic capacity by minimising disruption from crashes and breakdowns on the Graham Farmer Freeway and the inner-city sections of the Mitchell and Kwinana freeways, as well as blockages from illegal clearway parking in the CBD,” he said. “It will also involve real time management of traffic signals, so where incidents occur or roadworks are impeding traffic flow, Main Roads will modify traffic signal timings to maximise traffic flow, particularly during peak periods.”

CBD public transport will also receive a significant boost with additional Red CAT buses in operation from July 2012, ahead of the July 2013 introduction of a new Green CAT service every 10 minutes.
UTC

Related Content

  • April 25, 2012
    Eptisa TI supplies IT system to Aragon for road management
    Spanish IT firm, Eptisa TI, has developed a new computer which will allow the Spanish regional government for Aragon and road concession companies to maintain control of their road network and manage possible incidents. The system, based on ESRI’s Geographic Information System (GIS), will allow companies to manage eight sectors which contain some 2,400 km of roads which are the responsibility of the Aragon government. The new system is part of the RED Project, which is budgeted at over US$949 million for
  • May 14, 2014
    Australia’s infrastructure spending plans
    In its federal budget announced on 13 May 2014, the Australian government announced plans for new infrastructure projects costing US$117.04 billion to keep the economy going after the mining boom ends. The new funding and existing projects are expected to boost infrastructure investment to US$47 billion by end of the decade. The government will invest US$11 billion to fast track infrastructure projects including US$3.4 billion for road projects, US$4.6 billion to asset-recycling fund for states and US$2.
  • December 6, 2013
    Transmax trials emergency vehicle ‘green wave’
    Existing equipment used in Australian emergency vehicle ‘green wave’ trial. Despite the lights and sirens, accidents between the motoring public and emergency vehicles on their way to/from the scene of an incident are relatively frequent. Figures from various sources indicate that road accidents are the second most frequent cause of death for on-duty fire fighter fatalities and that more than 90% of ambulance and fire engine accidents occur when the lights are on and the sirens wailing. Other studies indica
  • August 19, 2013
    New era of MAX transport for Perth
    A joint venture of Parsons Brinckerhoff and Aecom has been selected by Western Australia’s Department of Transport (DoT) to form an integrated services team for the next phase of the 22 km Metro Area Express (MAX) light rail network. The JV is working with the DoT to develop a robust business case for the US$1.8 billion project that will change the face of Perth’s transport network. MAX project director for the DoT, David Thomas, said the project will introduce a new era of public transport to Perth. “MAX w