Skip to main content

Comprehensive plan to tackle Perth’s traffic congestion

The government of Western Australia has released a comprehensive plan to address traffic congestion in and around the central business district (CBD) of Perth with an AU$47.6 million (US$48.96) budget package to ensure the district has a sustainable transport network to accommodate major city projects and a growing population.
April 24, 2012 Read time: 2 mins
RSSThe government of Western Australia has released a comprehensive plan to address traffic congestion in and around the central business district (CBD) of Perth with an AU$47.6 million (US$48.96) budget package to ensure the district has a sustainable transport network to accommodate major city projects and a growing population.

“The Perth Waterfront Development, Perth City Link and Riverside projects are under way or are about to start, and are integral components to the transformation of Perth into a vibrant and modern city,” said transport minister Troy Buswell. “These projects will clearly impact on the flow of traffic in and around the city, and the CBD Transport Plan outlines how this impact will be managed and how we can better meet the needs of drivers, users of public transport, pedestrians and cyclists.”

Buswell said $47.6million from the Perth Parking Management Account would be used to introduce active traffic management and to establish incident response crews which remove broken-down vehicles.

“Active traffic management will increase road safety and traffic capacity by minimising disruption from crashes and breakdowns on the Graham Farmer Freeway and the inner-city sections of the Mitchell and Kwinana freeways, as well as blockages from illegal clearway parking in the CBD,” he said. “It will also involve real time management of traffic signals, so where incidents occur or roadworks are impeding traffic flow, Main Roads will modify traffic signal timings to maximise traffic flow, particularly during peak periods.”

CBD public transport will also receive a significant boost with additional Red CAT buses in operation from July 2012, ahead of the July 2013 introduction of a new Green CAT service every 10 minutes.

Related Content

  • Arup’s vision of urban mobility in 2050
    May 6, 2015
    Arup’s vision of the Future of Highways considers a wide range of factors that will impact on mobility towards the middle of the century. In its consideration of the Future of Highways through to 2050, international consultants Arup has taken a broad and pragmatic view of where society is heading and the effects that will have on the transport requirements. In terms of major drivers it not only cites
  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i
  • Real time active traffic management improves travel times
    July 17, 2012
    Traffic management centres (TMC) have traditionally served to provide surveillance and responses to traffic incidents and recurring and non-recurring changes in road networks. Typically, a TMC collected field data from the roadway and transit infrastructure and provided the integration necessary for operators to see what was happening and then coordinate a response. Standard operating procedures (SOPs) guided operators on how to respond to a given situation. It eventually became impractical for TMC operat
  • Infrastructure and the autonomous vehicle
    December 12, 2014
    Harold Worrall ponders the effect of autonomous vehicles on transportation infrastructure. For the last century the transportation industry has been focused on the supply of infrastructure to support the ever growing fleet of vehicles and the greater number of miles covered by each vehicle. Our focus has been planning, funding, designing, building and maintaining roadways. Politicians, engineers, planners, financial managers … all of us have had this focus. We have experienced demand growth since the first