Skip to main content

Communication is key to I-80 implementation

The I-80 Smart Corridor is to use 133 energy-saving, low-light-pollution signs on the 31.4km (19.5miles) route between the Oakland Bay Bridge and the Carquinez Bridge in California. Due to open next year, the US$80m project will see adaptive metering at 44 on-ramps (with bus priority and HOV bypass) and the new signs will be used for lane management and to advise drivers of incidents and variable speed limits. The system will be managed from a centralised control room in Oakland and the traffic signa
September 26, 2014 Read time: 1 min
The I-80 Smart Corridor is to use 133 energy-saving, low-light-pollution signs on the 31.4km (19.5miles) route between the Oakland Bay Bridge and the Carquinez Bridge in California.

Due to open next year, the US$80m project will see adaptive metering at 44 on-ramps (with bus priority and HOV bypass) and the new signs will be used for lane management and to advise drivers of incidents and variable speed limits.

The system will be managed from a centralised control room in Oakland and the traffic signal timing will be coordinated with local streets with all information shared with the other administrations along the route.

Related Content

  • Integrated corridor management 'to enhance travel efficiency'
    August 29, 2012
    New systems of software are coming together to form the technological backbone of a project that will apply practically to one corridor in Dallas, but influence travel across a wider area. Dallas Area Rapid Transit (DART) is the lead agency for an extensive Integrated Corridor Management (ICM) project in Dallas, covering an area stretching north east of downtown Dallas, 20 miles long by two miles wide. The corridor is defined loosely by the US-75 freeway and DART’s light rail ‘red line’. These are the theor
  • New Port Mann Bridge opens to eight lanes of traffic
    December 6, 2012
    Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
  • Syracuse models post-industrial revival for US cities
    August 13, 2015
    A connective corridor in Syracuse, New York State, could be a model for other post-industrial cities, as David Crawford discovers. The aim of the city of Syracuse’ 5.6km-long Connective Corridor in Onandaga County in upstate New York is to create a model ‘complete street’ for use in wider regeneration schemes. Key transport-sector components are traffic calming, high-quality transit with accessible passenger information, plus walkability and bike-friendliness.
  • The great pay divide
    April 2, 2014
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle