Skip to main content

Colorado statewide transit integration plan gets rolling

Hoping to lay the groundwork for a future integrated system across the state, Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service. With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector ope
June 5, 2013 Read time: 2 mins
Hoping to lay the groundwork for a future integrated system across the state, 5701 Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service.
 
With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector operation that would provide links between them.

The transit plan, expected to take up to eighteen months to complete, is a first step, intended to be an inventory of existing transit options across the state and an analysis of what else riders need. It will also set out policies backing programs that make transit more available and attractive to travellers and more time-competitive with cars, according to a CDOT statement on the plan.

“It’s really working in each area of the state to look at what each of those systems’ needs are and how that integrates into a whole statewide picture,” CDOT project manager Tracey MacDonald said. “It’s a new endeavour.”

The plan is the second step in the creation of a transit and rail element of the State Transportation Plan. In March 2012, officials adopted a Freight and Passenger Rail Plan, which called for investment in a now-under way Advanced Guideway System feasibility study and, depending on the outcome of the study, a high-speed rail between Denver and Eagle County.

For more information on companies in this article

Related Content

  • Roadside infrastructure key to in-vehicle deployment
    November 28, 2013
    The implementation of in-vehicle systems will require multilateral cooperation, as Honda’s Sue Bai explains to Colin Sowman. Vehicle manufacturers will shape the future direction of in-vehicle ITS systems, but they can’t do it on their own. So to find out what they see on the horizon, and the obstacles they face, ITS International spoke to Sue Bai, principal engineer in the Automobile Technology Research Department with Honda R&D Americas. Not only does she play an important role in Honda’s US-based ITS
  • Elon Musk’s underground movement
    August 3, 2020
    The Boring Company is building tunnels under various US cities – but for what? Kristina Smith delves deep into a project which may (eventually) have real appeal for mass transit providers and transportation agencies
  • MobilityXX: ‘Women pay more for safe transport’
    October 8, 2021
    Laura Chace, new boss of ITS America, is fully behind the MobilityXX initiative, which promotes the role of women in transportation. She tells Adam Hill why the ’10 by 10’ target is so important…
  • Vancouver narrows bridge & tunnel options
    September 21, 2020
    The Burrard Inlet Rapid Transit Study has now identified five potential crossings