Skip to main content

Colorado statewide transit integration plan gets rolling

Hoping to lay the groundwork for a future integrated system across the state, Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service. With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector ope
June 5, 2013 Read time: 2 mins
Hoping to lay the groundwork for a future integrated system across the state, 5701 Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service.
 
With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector operation that would provide links between them.

The transit plan, expected to take up to eighteen months to complete, is a first step, intended to be an inventory of existing transit options across the state and an analysis of what else riders need. It will also set out policies backing programs that make transit more available and attractive to travellers and more time-competitive with cars, according to a CDOT statement on the plan.

“It’s really working in each area of the state to look at what each of those systems’ needs are and how that integrates into a whole statewide picture,” CDOT project manager Tracey MacDonald said. “It’s a new endeavour.”

The plan is the second step in the creation of a transit and rail element of the State Transportation Plan. In March 2012, officials adopted a Freight and Passenger Rail Plan, which called for investment in a now-under way Advanced Guideway System feasibility study and, depending on the outcome of the study, a high-speed rail between Denver and Eagle County.

For more information on companies in this article

Related Content

  • Developing Mexico's ITS standards and infrastructure
    February 28, 2013
    Promoting open market conditions for ITS deployment remains a major part of Mexico’s recent infrastructure modernization program. Travis P Dunn, partner at D’Artagnan Consulting, looks at the progress so far. In the past six years, Mexico has embarked on an ambitious infrastructure modernization program, calling for the construction and improvement of more than 19,000km of road infrastructure and the deployment of advanced technologies that improve safety, efficiency, and convenience for road users. One of
  • Ertico is looking east: here’s why
    March 3, 2020
    The first Central Eastern Congress on ITS is to be held in Russia in September. Jacob Bangsgaard, CEO of Ertico – ITS Europe, tells Adam Hill why the event is necessary – and what visitors can expect
  • Fluor: here's how to fix US infrastructure
    June 14, 2018
    US president Donald Trump’s comments about the country’s ‘crumbling infrastructure’ led many in the ITS sector to spot an opportunity to help with other solutions. David Seaton of Fluor ponders the scale of what’s required and considers some projects which have boosted mobility We can no longer wait for future generations to address this nation’s crumbling infrastructure. We need to act now. The problem is substantial, to say the least. The American Society of Civil Engineers predicts that failing to clo
  • New thinking needed on the transportation front
    December 10, 2014
    Having spent his working life in transportation, Larry Yermack gives his views on today’s technology challenges. I remember it vividly; it was the late 80s, soon after I started as CFO of the Triborough Bridge and Tunnel Authority and I was standing mid-span on the deck of the Verrazano Narrows Bridge on a Friday afternoon.