Skip to main content

Colorado statewide transit integration plan gets rolling

Hoping to lay the groundwork for a future integrated system across the state, Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service. With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector ope
June 5, 2013 Read time: 2 mins
Hoping to lay the groundwork for a future integrated system across the state, 5701 Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service.
 
With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector operation that would provide links between them.

The transit plan, expected to take up to eighteen months to complete, is a first step, intended to be an inventory of existing transit options across the state and an analysis of what else riders need. It will also set out policies backing programs that make transit more available and attractive to travellers and more time-competitive with cars, according to a CDOT statement on the plan.

“It’s really working in each area of the state to look at what each of those systems’ needs are and how that integrates into a whole statewide picture,” CDOT project manager Tracey MacDonald said. “It’s a new endeavour.”

The plan is the second step in the creation of a transit and rail element of the State Transportation Plan. In March 2012, officials adopted a Freight and Passenger Rail Plan, which called for investment in a now-under way Advanced Guideway System feasibility study and, depending on the outcome of the study, a high-speed rail between Denver and Eagle County.

For more information on companies in this article

Related Content

  • New York to pilot cordon-based congestion charging
    March 16, 2012
    From 2009, if all goes to plan, New York will run a three-year cordon-based congestion charging pilot - the first in the US. Upon accession, US Secretary of Transportation Mary Peters signalled her intention to continue her predecessor Norman Mineta's initiative to specifically target road congestion. And, with initiatives such as the US Department of Transportation's (USDOT's) Urban Partnership Program actively promoting tolling as a part of a compound solution to the problem, the way was opened for the co
  • New York to pilot cordon-based congestion charging
    March 16, 2012
    From 2009, if all goes to plan, New York will run a three-year cordon-based congestion charging pilot - the first in the US. Upon accession, US Secretary of Transportation Mary Peters signalled her intention to continue her predecessor Norman Mineta's initiative to specifically target road congestion. And, with initiatives such as the US Department of Transportation's (USDOT's) Urban Partnership Program actively promoting tolling as a part of a compound solution to the problem, the way was opened for the co
  • Strong demand for TIGER grants
    May 16, 2014
    Applications to the US Department of Transportation for its sixth round of Transportation Investment Generating Economic Recovery (TIGER) grants totalled US$9.5 billion, 15 times the US$600 million set aside for the program, demonstrating the continued need for transportation investment nationwide, according to an announcement by Transportation Secretary Anthony Foxx. The Department received 797 eligible applications, compared to 585 in 2013, from 49 states, US territories and the District of Columbia.
  • Don’t look at the jigsaw pieces – see the whole puzzle, says CCTA
    February 19, 2024
    There are three main barriers to taking transport ideas from the pilot stage to real-life usage: incompatible technology, local control and limited funding. Tim Haile of California’s Contra Costa Transportation Authority has some thoughts on how to overcome them