Skip to main content

Colorado statewide transit integration plan gets rolling

Hoping to lay the groundwork for a future integrated system across the state, Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service. With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector ope
June 5, 2013 Read time: 2 mins
Hoping to lay the groundwork for a future integrated system across the state, 5701 Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service.
 
With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector operation that would provide links between them.

The transit plan, expected to take up to eighteen months to complete, is a first step, intended to be an inventory of existing transit options across the state and an analysis of what else riders need. It will also set out policies backing programs that make transit more available and attractive to travellers and more time-competitive with cars, according to a CDOT statement on the plan.

“It’s really working in each area of the state to look at what each of those systems’ needs are and how that integrates into a whole statewide picture,” CDOT project manager Tracey MacDonald said. “It’s a new endeavour.”

The plan is the second step in the creation of a transit and rail element of the State Transportation Plan. In March 2012, officials adopted a Freight and Passenger Rail Plan, which called for investment in a now-under way Advanced Guideway System feasibility study and, depending on the outcome of the study, a high-speed rail between Denver and Eagle County.

Related Content

  • November 18, 2016
    CDOT launches road usage charge pilot research program
    The Colorado Department of Transportation (CDOT) has explored a number of ways to find sustainable road funding. It is facing a nearly US$1 billion annual funding gap over the next 25 years and is looking to explore transportation funding alternatives as the fuel tax continues to become less reliable over time, due decreased purchasing power and more fuel efficient and electric vehicles. This pilot is the first step in an extensive process of evaluating the concept alongside other funding alternatives. I
  • May 29, 2014
    The role of GIS in climate change resiliency
    Climate change will pose global and local challenges and that includes risks to the transportation infrastructure. Climate change adaptation and resiliency has captured the attention of the transportation community for some time now. Because transportation infrastructure is often designed to last for 30, 50, or 100 years or even longer, transportation professionals are concerned not only about the impact on our existing investments, but also how to design more durable transportation systems for the future
  • June 29, 2018
    Atlanta ponders Mobility as a Service for seamless transit
    Drivers in Atlanta spent 70 hours in peak-time traffic jams last year. As the MaaS Market conference moves to the US’s fourth most congested city, we ask how Mobility as a Service can help. Colin Sowman winds down his window to listen. It is not by accident that ITS International’s first MaaS Market conference outside London is being hosted in Atlanta. The event is being supported by Georgia State Road & Tollway Authority and the City of Atlanta – and again not without a reason as metro Atlanta is looking
  • April 14, 2014
    Colorado DOT awards services contract to Atkins
    Engineering consultancy Atkins has been awarded a contract to serve as general tolling services advisor to the Colorado Department of Transportation (CDOT). Under the terms of the contract, Atkins will work with CDOT’s Office of Major Project Development (OMPD) to provide a broad spectrum of on-call advisory services in support of CDOT’s tolled lanes and managed lanes programs. Atkins will collaborate closely with several divisions of CDOT, including its toll-collection agency, known as the High Performa