Skip to main content

City of Seattle implements SCOOT adaptive traffic management

Seattle Department of Transportation (SDOT) has implemented a new adaptive traffic control system at 32 intersections along Mercer Street between 3rd Ave W and I-5, which has been one of the city’s most congested corridors for over 40 years. Developed by the UK’s Transport Research Laboratory, the SCOOT (Split Cycle Offset Optimisation Technique) system coordinates the operation of the traffic signals in and around the corridor to help vehicles move more efficiently. SCOOT works in real-time to reduce delay
May 2, 2017 Read time: 2 mins
Seattle Department of Transportation (SDOT) has implemented a new adaptive traffic control system at 32 intersections along Mercer Street between 3rd Ave W and I-5, which has been one of the city’s most congested corridors for over 40 years.


Developed by the UK’s Transport Research Laboratory, the SCOOT (Split Cycle Offset Optimisation Technique) system coordinates the operation of the traffic signals in and around the corridor to help vehicles move more efficiently.

SCOOT works in real-time to reduce delays and adapt to changing traffic volumes, such as congestion caused by nearby sport or concert events. The system detects cars in each lane at every intersection. It determines traffic levels, predicts the flow of traffic and adjusts the amount of time available to each movement through the intersection. The result is more effective and responsive signal operations. SCOOT provides significant benefits:

• Quicker, more reliable travel times through the network
• Enhanced transit operations
• Reduced overall emissions and fuel consumption
• Effective management of traffic fluctuations due to special events

To assess the how well SCOOT is working, vehicle data is being collected daily and compared to historical averages. Reporting periods include the three-hour morning and evening peak travel times in both the eastbound and westbound directions during the five-day working week. From the data received to date, drivers travelling east during peak times are experiencing a six per cent increase in morning travel time reliability and 38 per cent in the evenings.

“This new system will adjust signal timing based on traffic in and around Mercer in real time. We know Mercer is the busiest corridor in the city,” said SDOT Director Scott Kubly. “SCOOT will help reduce the traffic backups we’ve seen along Mercer and help keep people moving.”

UTC

Related Content

  • May 18, 2016
    Managing Seattle’s congestion with Siemens intelligent software
    The City of Seattle, Washington, is to implement Siemens’ Concert, an integrated traffic management platform that connects both Siemens and third-party systems across the city including traffic control centres, intersection controllers and parking guidance systems. The Concert platform will integrate Siemens’ TACTICS traffic control system as well as the city’s existing dynamic message sign management system the local travel time system and the Washington Department of Transportation (WSDOT) freeway sys
  • June 25, 2012
    White Plains opts for TransCore solution
    The city of White Plains in New York is deploying a new SCATS-based adaptive traffic signal control system from TransCore. The system will collect real-time information and then adjust signal timing parameters on a cycle-by-cycle basis on one of the city’s major arterials. Previous conventional traffic control techniques, such as time-of-day signal timing and responsive timing plan selection, were not able to accommodate all the variable and unpredictable traffic conditions experienced on the Tarrytown Road
  • February 28, 2013
    Upgrading New Yorks's traffic signal timings
    The New York City Department of Transportation instituted the Midtown in Motion project to promote multimodal mobility in the Midtown Core of Manhattan, a 110 square block area or “zone” from Second to Sixth Avenue and 42nd to 57th Street. Control extended from 86th Street to 23rd Street, focused on the core zone. MiM provides signal timing changes on two levels: Level 1 control starts from a pre-stored library of timing plans. These are designed offline and are relevant to arterials inside the Midtown stud
  • February 28, 2025
    Big event traffic management: Taylor's Version
    StreetLight crunches Swifties numbers on US Eras Tour to find a clear winner