Skip to main content

Christchurch trials traffic management during rebuild

Trials are being set-up throughout Christchurch to look at ways of improving traffic management around road works sites to help reduce motorist delays and minimise driver frustration. Following the earthquakes, New Zealand’s Christchurch City Council and New Zealand Transport Agency have been working closely with Stronger Christchurch Infrastructure Rebuild Team (SCIRT) and Environment Canterbury to find ways to keep people, goods and services moving to support the rebuild.
June 19, 2013 Read time: 2 mins

Trials are being set-up throughout Christchurch to look at ways of improving traffic management around road works sites to help reduce motorist delays and minimise driver frustration.

Following the earthquakes, New Zealand’s Christchurch City Council and 6296 New Zealand Transport Agency have been working closely with Stronger Christchurch Infrastructure Rebuild Team (SCIRT) and Environment Canterbury to find ways to keep people, goods and services moving to support the rebuild.

Christchurch City Council Transport and Greenspace Manager John Mackie says more and more pressure is being put on the road network with an ever increasing number of works sites being set up for the rebuild.  The roads are required to support vehicles, cyclists and pedestrians, the crews and equipment for repairing water, storm water and sewerage pipes, those upgrading utilities and building and repairing the roads, as well as those working on rebuilding the central city.

He says critical to the success of the rebuild and for the region’s economic prosperity is keeping the transport network operating at optimal levels. “To achieve this, we need to keep everyone moving.”

A number of trials and investigations are already under way to examine how to deliver greater efficiency with temporary traffic management, speed management and improved messaging to reduce delays and minimise detours.

Mr Mackie says the trials are being carried out at existing SCIRT works sites, with the first results expected within the next couple of months.

For more information on companies in this article

Related Content

  • London’s strategy to tackle air quality problems
    October 21, 2014
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency
  • Developments in urban traffic management and control
    February 1, 2012
    Mark Cartwright, Centaur Consulting, discusses developments in urban traffic management and control. Despite the concept of UTMC (Urban Traffic Management and Control) having been around for some years now, there remains a significant rump of confusion as to its relationship with its similar-sounding cousin UTC (Urban Traffic Control). To many people, the two are one and the same. However, this is not the case.
  • Cost benefit: Wichita eases workzone congestion
    July 8, 2019
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut