Skip to main content

Chile launches ambitious transport plan

In an effort to boost a weakening economy, Chilean President Michelle Bachelet has announced a nearly US$4.2 billion transport infrastructure plan, including one new metro line in Santiago, cable car systems in three other cities and rail projects. The plan includes US$1.9 billion in new concessions, with the expansion of public-private partnerships (PPPs) to the metro system and US$2.2 billion in works directly funded by the government. In Santiago, the program involves developing feasibility studie
November 7, 2014 Read time: 2 mins
In an effort to boost a weakening economy, Chilean President Michelle Bachelet has announced a nearly US$4.2 billion transport infrastructure plan, including one new metro line in Santiago, cable car systems in three other cities and rail projects.

The plan includes US$1.9 billion in new concessions, with the expansion of public-private partnerships (PPPs) to the metro system and US$2.2 billion in works directly funded by the government.

In Santiago, the program involves developing feasibility studies for a new metro line under a PPP model to alleviate congestion on line No. 1, which runs east-west and transports 43 per cent of the subway's passengers.

The president also detailed plans to extend line No. 3, currently under construction, and line No. 2, with a total investment of US$1.17 billion.

The government will also invest an additional US$317 million in expanding metro capacity with new trains.

State company Metro de Santiago is currently building the 22km-long line No 3, which will connect Ñuñoa in eastern Santiago and Huechuraba in the north of the city, and line 6, a US$1.06 billion project that will run 15.3 kilometres from centrally located Providencia to Cerrillos in the west.

The government will also build three cable car systems in northern Iquique and Antofagasta cities and in central Valparaíso, an investment of US$386 million.

In southern Chile, the government will add five kilometres to Concepción's urban rail system and will carry out feasibility studies to add new railway lines in Temuco and Puerto Montt.

Two days ago, Bachelet announced new concessions of US$6-8 billion, on top of the national infrastructure plan announced earlier this year that includes US$9.9 billion in new concessions through 2020, and US$18 billion in public works projects through 2021, including highways, airports and reservoirs.

"This is new and additional. It's a renewed concessions portfolio in public transport, urban and suburban highways and ports for US$6 billion to US$8 billion," Bachelet told reporters.

Bachelet aims to increase public infrastructure spending to 3.5 per cent of GDP by the end of the decade from the current 2.5 per cent.

Related Content

  • Cable cars come of age in trans-continental expansion
    April 30, 2015
    David Crawford explores a high-level option of public transport. Sharing its origin with that of ski lifts at winter sports resorts in the European Alps, urban aerial cable transport is attracting growing interest as a low-footprint, low-energy alternative to conventional public transport that can swoop over ground-level traffic congestion.
  • Government support for Australian infrastructure projects
    April 12, 2016
    The Australian Government has announced plans to invest in Australia’s infrastructure, spending US$370.27 million (AU$490 million) in Western Australia infrastructure in 2016-2017 and US$1.2 billion (AU$1.5 billion) on road and rail projects in Victoria. Prime Minister Malcolm Turnbull stated that the federal government and the Western Australia state government will work together to identify the appropriate projects for the additional investment. A spokeswoman for West Australian Premier Colin Barnett,
  • Santiago metro contract awarded
    January 20, 2014
    Spain’s Isolux Corsán has been awarded a US$100 million contract for the construction of a section of line 3 of the Santiago Metro in Chile. The project, part of the Metro Project, aims to improve the entire underground network in Santiago includes the construction of a 3.7 kilometre tunnel under the Chilean capital and includes the construction of three stations, five circular shafts and two rectangular shafts over a period of 28 months. It is expected to start operating in 2018.
  • The long road to Spanish enlightenment
    October 22, 2018
    Julián Núñez, immediate past president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid. Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth: people want to avoid the pain. But pain is something that Spanish operators, including Abertis, OHL, ACS, FCC and Acciona, have been going through for the past decade. The country has